Goliath Shipbuilding Gantry Crane 100ton

1.Lifting from 100 to 600 t, 2.Top running crane, under slung crane, 3.frequency convers, 4.Professional installation, 5, ISO - details see: https://www.machineto.com/goliath-shipbuilding-gantry-crane-100ton-10099732
Feature:Gantry CraneCondition:NewApplication:shipmaking yardRated Loading Capacity:100-600ton
Rated Lifting Moment:1000-6000KNMax. Lifting Load:100-600tonMax. Lifting Height:up to youSpan:up to you
Place of Origin:China (Mainland)Brand Name:HYModel Number:MEC Shipyard's Gantry CraneCertification:ISO
Warranty:16monthAfter-sales Service Provided:Engineers available to service machinery overseasCantilever::no/one/two sidesGirder structure::box /truss beam type
Warranty::16monthWorking Duty::A5~A7Electric current::380V 50Hz three-phase or on requestCertification::CE,ISO,OHSAS
Crane Electric equipment:Schneider/Siemens/Your requestGantry crane overload protection:IncludeCrane Voltage lower protection:IncludeGantry crane sling method:Include
Goliath Shipbuilding Gantry Crane 100ton
contact supplier for Goliath Shipbuilding Gantry Crane 100ton


Introduction of Goliath Shipbuilding Gantry Crane Shipbuilding gantry crane is crane machinery with large hoisting capacity, multiple functions and high efficiency, dedicated to subsection transportation of large ship, butt jointing, and overturning on dock or shipway.

Design features include:

1. Main girder:
is welded of steel plates, connected by high-strength precision bolt. There are sliding rail for trolley to travel upper the girder which is fixed on outrigger by high-tension precision bolt

2. Outrigger
a). Consist of rigid outrigger and flexible outrigger, all connection points are connected by high-tension bolt
b). The ladder is used by operator to enter into cab or arriving at winch
c). when the span>30m, there need a flexible leg aiming at reducing the lateral thrust the trolley has to the rail when the girder load objects.

3. Travelling mechanism
consist of driving gear box and passive wheel box.

a). The driving gear box supplies power to realize the crane’s travelling.

b). what the difference between driving gear box and passive wheel box is that passive wheel box lacks transmission structure such as dynamo, reducer and a pair of exposed gear

4. Trolley with hoist
is made up of trolley frame, winch and pulley block
a). Trolley frame welded of steel plate is the loading and travelling mechanism of trolley with hoisting
b). Winch is the lifting mechanism of trolley..when it works, wire rope affects the pulley as rising and falling movement, which makes suspended objects lifting and lowering
Warning: wire ropes need to be examined regularly and changed in time if there is a 10% broken wires, loosen wires and wearing down.

5. Cab
a). Glass window through which one can watch overall working condition is installed in the front and two sides of the cab
b). Electric cabinet as a group of independent cabinet , fixed outside of cab is connected by control cable and linkage station which is set up in the cab

6. Electrical system
a). lifting motor, crane travelling motor and hydraulic power motor are included. The whole electrical system is controlled by PLC.
b). two ways to operate the crane: cab operating and remote controlling.
c). Electric components are imported from Schneider in Germany

7. Platform
platform is installed in order to maintain the crane, the protective guard is added to protect the safety of servicemen.

Product specification

250t×60m300t×108m600t×60m

Working class

A5

Capacity

Common lifting

t250200600

Turning over

t200200400

Span

m6010860

Hoisting height

m4870Above rail 40 Below rail 5

Upper trolley

Capacity

t100×2100×2200×2

Hoisting speed

m/min

0.5-5-100.5-5-100.4-4-8

Traveling speed

1~28.53~301~25

Lower trolley

Capacity

Main hook

t

100150300
Sub hook202032

Hoisting speed

Main hook

m/min

0.5-5-100.5-5-100.4-4-8
Sub hook101010

Traveling speed

1~26.53~301~25

Maintenance hoist

Capacity

t555

Hoisting speed

m/min

888

Trolley speed

202020

Rotating speed

r/min0.90.90.9

Gantry speed

m/min1~26.53~301~25

Max. wheel load

kN200450430

Power source

380V / 10kV; 50Hz; 3 Phase or on request

Cooperative Brand:

1.We promise to provide brand-new and quality guaranteed products

2.we promise to provide practical solution to settle the problem the user encounters

3.One year warranty for whole machines.

4.Low charge for continue maintenance when warranty is expired.

5.Exclusive support engineer.

6.We can provide the free training to end-users.

Pls kindly tell us the following information before sending us the enquiry,so that we can help choose the most suitable material handling for you:

1.Lifting capacity

2.lifting height(from the ground to hoist hook)

3.Span(rail center to rail center)

4.Power supply(to match with the motor)

5.Main usage

6.Need cantilever or not?If need,how long?

Goliath Shipbuilding Gantry Crane 100ton
Packaging Detail:Electric parts and electric hoist are packed by strong plywood crate,others packaged in plastic woven cloth.
Delivery Detail:within 50days after receiving deposit

Related Product for Goliath Shipbuilding Gantry Crane 100ton