Gold Mining Machine/ Gold Mining Equipment For Ore Dressing Process

Gold Mining Equipment, 1.BV certificate, 2.2 years guarantee(wearing parts exclude), 3.exported over 30 countries - details see: https://www.machineto.com/gold-mining-machine-gold-mining-equipment-for-ore-dressing-process-10318625
Place of Origin:Henan China (Mainland)Brand Name:DEFYModel Number:Gold mining equipmentCondition:New
quality:China standard, high qualitymotor:China famous brand or as requireguarantee:2years(wearing parts exclude)color:as require
installation:offer the foundation drawing, guided by our engineerapplication:for ore,beneficiationCertificate:BVType:Gold Mining Equipment
Gold Mining Machine/ Gold Mining Equipment For Ore Dressing Process
contact supplier for Gold Mining Machine/ Gold Mining Equipment For Ore Dressing Process


process flow chart ,Gold mining equipment

Defy owns a top Expert Team which is composed of senior talents professional in different fields,

such as miningore dressing, wearresistant casting, heat treatment, etc. In addition to all kinds of

mining equipments and parts, drawing design, technical consult & support, equipment installation

and maintenance, other related paid or free services are also available from Defy Company at any

time. We also provide year round mining equipment components and parts.

1)Through thevibrating feeder, the materials will slip and sling the funnel,moving forward. when the materials pass the screen part, smaller parts will fall down.avoiding the further crushing, so screening purpose can be reached

2)Material to be crushed by theJaw crusheris introduced into the upper end of thecrushing chamber formed between the two jaws and is crusher between the two jaws by the swinging movement of the movable jaws as the material moves downwardly through the chamber, the crusher material being discharged from the chamber as its lower end

3) the appropriate stone size (10~20 mm) will be get from the last process, then will be

evenly feed into the Ball Mill through the elevator and mining feeder, the ball mill break

and grind the ore into the fine ore; then feed into the spiral classifier

4) Due to the gravity differences of the solid particles, their deposition rate will be

different too, using this theory, the spiral classifier will wash and classify the fine ore

particles

5) The washed and classified fine ore particles will be sent to the Magnetic Separator,

making use of minerals susceptibility differences, magnetic separator will separate the

magnetic minerals from the fine ore particles mixers by the magnetic force and mechanical

force, and get 65% iron ore concentrate

6) Mixing Tanks (Agitation barrels) are used for stirring the slurry before flotation

operations

7) When the Flotation Machine works, the motor drives the impeller to revolve, so the

centrifugal effect and negative pressure are produced. On one hand, ample air is

absorbed and mixed with mineral slurry, on the other hand, the mixed mineral slurry is

mingled with additive:

8) Rotary Dryer is used for metal mining processing and drying all kinds of metal ore,

leaching slag and tailing etc:

SGS,BV and Custom certificate of our products and trade

Debbie Liu / Sales Department

Zhengzhou Defy Mechanical&Electrical Equipment Co., Ltd

Fax: 86-371-66770722

Tel: 86-371-55819257

Mobile: 86-13213019085

Skype:defy004

Web: www.zzdefy.cn

Gold Mining Machine/ Gold Mining Equipment For Ore Dressing Process
Packaging Detail:China standard packing , seaworthy packing or as require
Delivery Detail:In 10 working days after the down payment

Related Product for Gold Mining Machine/ Gold Mining Equipment For Ore Dressing Process