GD1200 Hydraulic double cylinder thermoplastic road marking paint preheater
Condition:New | Place of Origin:Henan China (Mainland) | Brand Name:GEC | Model Number:GD1200 |
Dimension(L*W*H):1800*1700*1700mm | Weight:1000kg | Features:hydraculic | Certification:ISO CE |
Warranty:1 year | After-sales Service Provided:Engineers available to service machinery overseas | Type:thermoplastic road marking paint preheater | Kettle cyclinder:2*600L |
Application:for hot melt spraying machine | Advantage:Hydraulic driving system | Engine:15PS diesel engine | heating system:petroleum gas |
Drive model:oil pressure | color:customised | Performance:excellent | quality:Low maintainance |
Choose GEC, choose high quality!
GD1200 Hydraulic double cylinder thermoplastic road marking paint preheater
Thermoplastic road marking paint preheater Description:
GD1200 double cylinder thermoplastic hot melt kettle is the major equipment for hot melt spraying construction.
Hydraulic driving system and stepless speed changing with strong torque are adopted.
The equipment boots efficient fusing, forward and reverse stir, simple operation and easy maintenance. Special design of heating system, stainless steel material, and high carbon steel pot bottom, imported efficient stoves are adopted, it saves energy and time.
Thermoplastic road marking paint preheater Main technical parameter:
Dimension: 1900*1700*1700mm
Coating capacity: 2*600L
Drive mode: Oil pressure
Engine: 15PS diesel engine
Furnace: Imported
Heating system: Petroleum gas (50kg/jar recommended)
Thermoplastic road marking paint preheater Features:
- Engine: 15PS water-cooled electric start up diesel engine
- Hydraulic driving system: integrated multiples hydraulic control valve, forward and reverse stir and stepless speed changing.
- Hydraulic motor: Model BM
- Cubage of hydraulic gasoline box: 70L
- Kettle cylinder: capacity:600L*2
- Structure: Frame structure, insulation is fixed between liner and ektexine
- Heating system: petroleum dry gas (50 kg jar commended) and imported highly efficient four ring burner / direct injection stove
- Safety facility: flooding facility of overload is designed for it to prevent maloperation
Pictures:
Packaging Detail:road marking paint preheater1. standard export packing2. according to cuetomers' requirements |
Delivery Detail:in stock: 3 working days; usually: 10 working days or so. |