Gas Infrared Burner for Mango Dryer(HD101)
Place of Origin:Chongqing China (Mainland) | Brand Name:Haodong | Model Number:HD101 | Conversion rate:above 90% |
CO:less than 80ppm | NOx:less than 10ppm | CHx:less than 50ppm | Life:above 11000hr |
Gas:LPG/NG |
About us:
Chongqing Haodong Technology Co,. LTD isthe first and only companywho applyrare-earth catalyticcombustion technology on infrared burner & heater,this kind of technology couldsave 10~20% energythan non-catalytic infrared heater.
Now we producegas burner, infrared burner, gas heater, BBQ burner, bakary oven burner, industrial burner etc.
Gas Infrared Burner for Mango Dryer HD101:
Model | Length (mm) | Width (mm) | Height(mm) | Weight (kg) | Consumption | Heat Output | InletPort(Inch) | ||
NG | LPG | ||||||||
m3/h | kg/h | KW/h | Kcal/h | 3/8 | |||||
HD101 | 690 | 80 | 115 | 6.9 | 0.30 | 0.28 | 3.9 | 3380 |
Advantages :
- Energy saving: conversion rate≥90%
- Environmental protection:CO≤80ppm;NOx≤10ppm;CHx≤50ppm
- Whole combustion: 95% of energy released in the form of infrared ray; heating the objects directly
- Long useful time: above 11000hr
- Easily installed
Applied Range :
Food Industry: Rice Biscuit(rice cookies covered with snow-like sugar )assembly line, grilled chicken, biscuit, egg roll, roasting shredded squid oven, oven for roast duck, smokeless oven, griddle, middle eastern oven, hot pot oven, roasting pachyrhizus oven, snack car, soup oven, cooking assembly line, infra-red gas baking pan, deep-fry assembly line, water-removing machine, baking, etc.
Comparison table for different kinds of fuels and heater's energy consumption
Furnace type Parameters | Electronic cooker | Oil furnace | Coal-fired furnace | Infrared catalytic heaters |
Energy requirement | 10,000Kcal | 10,000Kcal | 10,000Kcal | 10,000Kcal |
Temperature | 180 | 180 | 180 | 180 |
Energy consumption | Electricity(15 kW/h) | Electricity (1Kw/h)+ diesel (2Kg) | Coal (10Kg) | LPG(0.9Kg) |
Heating time | 20 minutes | 40 minutes | 90 minutes | 5-8 minutes |
Packaging Detail:Inner packing: bubble plasticOuter packing: carton |
Delivery Detail:Within 5-10 days after the contract |