FZ-02-180 steel coil turnover machine
FZ-02-180 steel coil turnover machine, Automatic turning machine, Metal coil turnover machine, Heavy aluminum coil upender - details see: https://www.machineto.com/fz-02-180-steel-coil-turnover-machine-10061821
Type:Packaging Line,General | Condition:New | Application:industry | Packaging Type:turnover/upender |
Packaging Material:Other | Automatic Grade:Automatic | Driven Type:Hydraulic | Place of Origin:Shanghai China (Mainland) |
Brand Name:JINGLIN | Model Number:FZ-02-180 | Certification:ISO9001:2008 | Usage:Outer |
Brand:Jinglin | Original Place:Shanghai,China |
FZ-02-180 steel coil turnover machine
1.Automatic turning machine,metal coil turnover machine.
2.This serious of Jinglin automatic turnover machine can be used for dislocation of different vertical&horizontal goods.
3.They are widely used in metallurgical industries and steel industries.
Features:
Special double chain drive,oblique gear&worm speed reducer is adopted;
Four-roller device wrapped with polyamide adhesive;
Inverter controls are adopted,fast,stable&safe;
Ajustable machanical pressure device is adopted.
TECHNICAL DATA:
Items | FZ-03 | FZ-06 | FZ-10 | FZ-15 | FZ-30 | FZ-02-180 |
Max loading | 3T | 6 | 10T | 15 | 30 | 2 |
Turn-over speed | 50min±10% | 50min±10% | 60min±10% | 80min±10% | 120min±10% | 100min±20% |
Transfer mode | Double chain/four roller/ Oblique& worm speed reducer | Double chain/four roller/ hard tooth-face speed reducer | Double chain/four roller/ Oblique& worm speed reducer | |||
Power output | 0.75kw | 1.5kw | 2.2kw | 3.7kw | 5.5kw | 1.5kw |
Ratio | 1:286 | 1:286 | 1:286 | 1:286 | 1:286 | 1:286 |
Perspective | 90º | 90º | 90º | 90º | 90º | 180º |
Power voltage | 3 phase 380V | 3 phase 380V | 3 phase 380V | 3 phase 380V | 3 phase 380V | 3 phase 380V |
Working mode | Semi-auto/ remote control | Semi-auto/ remote control | Semi-auto/ remote control | Semi-auto/ remote control | Semi-auto/ remote control | Semi-auto/ remote control |
Packaging Detail:soft packing or standard wooden case |
Delivery Detail:normally 1 month after receiving the down payment |