Full Automatic Used Tyre Pyrolysis Plant With Capacity 20 T/d
Condition:New | Type:Tire Machine,tyre pyrolysis plant | Tire Machine Type:Tire Recycling Machine | Place of Origin:Henan China (Mainland) |
Brand Name:Lanning | Model Number:LN-2800-6000 | Voltage:380V | Power(W):15KW |
Dimension(L*W*H):6000*2800*2800mm | Weight:32ton | Certification:CE&ISO&BV | Warranty:1 year |
After-sales Service Provided:Engineers available to service machinery overseas | Reactor material:Q245R/Q345R boiler plate | Machine land needed:300~400square meters | Oil percentage:45~50% |
Reactor thickness:14mm/16mm | Reactor life:5~8 years | After service:installation and training | Capacity:10 tons per day |

Used Tyre Pyrolysis Plant with capacity 20T/D :
Oil yied/day | Used tyres,scrap tyres | Big truck tyres | 45%--50% |
Car tyres | 40% | ||
Bicycles and motorcycles tyres | 30%--35% | ||
Waste plastics | Fishing net,Safety net, farm-oriented film | 45%--50% | |
Conwenient bags , weave bags | 40% | ||
Off –cut of recycled paper mill | 20%--30% |
We mainly make four models of the waste tyre refining machine:
The raw material for pyrolysis plant as follow:
1, Industrial waste , allow multiple waste mixed simultaneously (more than 70%, but suggest PE, PVC less than 10%)
2 Waste oil , for example: waste machine oil, waste oil and diesel slag etc.
3, Waste rubber tyre
4, Waste carble skin,
Here are all models specifications:
Style | Reactor volume | Specification | per batch productivity | Per day productivity |
LN-5100 | 19M3 | 2.2*5.1 | 4TON | 6TON |
LN-6000 | 23M3 | 2.2*6 | 5TON | 7TON |
LN-2600-6000 | 32M3 | 2.6*6 | 8TON | 8TON |
LN-2800-6000 | 37M3 | 2.8*6 | 10TON | 10TON |
Processing time
Style | Feeding time(hours) | processing time(hours) | cooling time (hours) | Slag outlet time(hours) |
LN-5100 | 2 | 7 | 2 | 2 |
LN-6000 | 2 | 8 | 2 | 2 |
LN-2600-6000 | 2-3 | 10 | 2-3 | 2-3 |
LN-2800-6000 | 3 | 12 | 3 | 3 |
After- sale service :
1-we are responsible of machine installation and debugging .
2- Engineer will help worker to process and train workers .
3- Guarantee period for equipment (including accessories) is one year. ( except personal factor damage ) for reactor guarrance ,4-8 years

Packaging Detail:one 40 feet HQ & one 40 feet FR, |
Delivery Detail:10 days after receiving deposits |