FR-50 Irregular Metal Straightening Machine
Condition:New | Type:Straightener & Cutter | Use:Pipe | Place of Origin:Guangdong China (Mainland) |
Brand Name:FR-50 | Model Number:FR-50 | Voltage:380V | Power(W):7.5KW |
Dimension(L*W*H):1960*950*1400 | Weight:2500kg | Certification:ISO9000:2001 | Warranty:more than one year |
After-sales Service Provided:Engineers available to service machinery overseas | Straightening diameter range:S20-50mm | Length range:1-15m | Straightness:less more 0.5mm |
Straightening machine:pipes straightening machine | Origin:dongguan | Brand:FR-50 irregular straightening machine | Technology:Taiwan technology |
Color:green | Appearance:vertical | Applied:square and hexagon pipe |
FR-50 Irregular Straightening Machine
Straightening machine is straightening for metal bar, pipe, wire and other equipment. Straightening machine changes straightness by the straightening roller squeezing on the bar, etc, generally, there are two rows of straightening rollers and numbers different. There are also two roller straightening machines to straighten the material of different diameters, which rely on two roller (middle concave, hyperbolic roll) of. The main types has: Pressure straightening machine, balance roller straightening machine, shoes roller straightening machine, rotating anti-straightening machine and so on.
FR-50 Irregular Straightening Machineis metal processing straightening machine for bar, pipe, wire and other equipment. FR-20 Irregular Straightening Machine changes straightness by the straightening roller squeezing on the irregular bar,irregular pipe .
FR-20 Irregular Straightening Machine for metal processing,including aluminum, copper, stainless steel, mild steel, brass and iron,etc.
FR-50 Irregular Straightening Machinehave many features of high efficiency, high precision, not to hurt the surface, smooth running and easy to adjus. The development of new straightening machine after improved the straightening machine, straightness ≤ 0.5mm.
Name | Type | |
Straightening machine | FR-50 | |
Straightening diameter range | S20-50mm | |
Speed of workpiece | 0-45r/min≈24m/min | |
Range of length | 1-15m | |
Straighteness | 0.5≤mm/m | |
Straightening roller nos | 13groups (175*105mm) | |
Motor power | 7.5kw | |
Electric motor | 380V 50-60HZ | |
Weight (reference) | 2500kg | |
Dimension(L*W*H) | 1960*950*1400 |
photos
1.Quality guarantee
(1) Factory guarantees machinery well packed and testing qualified before shipment.
(2) Factory guarantees all the goods are brand-new; no defects for the specifications or materials used. Twelve months quality warranty after Customer accepts the inspection for machinery’s trial operation.
2.Claims:
Customer has rights to claims if there is quality problem caused by deficient manufacturing procedure, material or technical parameter, which doesn’t match the contract specified, factory will take responsibility for all related expenses caused.
3.Penalty:
1, if contractual delivery day postponed due to factory’s reason except force-majeure, Customer has rights to get the compensation by portion from factory based on the followings:
(1) factory has ten days grace period
(2) Starting from the eleven days after delivery day postponed, every day’s penalty for factory is the whole contract amount’s 0.1%.
2, if contractual payment day postponed due to Part A’s reason except force-majeure, factory has rights to get the compensation by portion from Customer based on the followings:
(1) Customer has ten days grace period
(2) Starting from the eleven days after payment day postponed, every day’s penalty for Customer is the whole contract amount’s 0.1%.
3, the above mentioned penalty total amount can not be exceeding the whole contract amount’s 5%.
4.Force Majeure:
We factory shall not be held responsible for late delivery of the goods owing to generally recognized Force Majerue. Factory should notice Customer by oral immediately. 15 days later after force Majerue happens, and post customer the written proof documents from the related departments. If force manjerue keeps more than 60 days, Customer can cancel the contract. Factory should return the payment.
5.Technical materials provide:
Factory should provide the following data: each of Chinese / English version manual and matching tools enclosed for one machine.
6.Contract amendment:
Any changes for the contract clauses, a written contract amendment must be signed by both parties.
7.Arbitration:
If there is dispute during contract implementation, we should settle through negotiation made in the principle of fair cooperation. If not, the case under dispute shall be submitted for arbitration. Which has the same equally binding to both Parties, The cost of arbitration shall be borne by the losing party. During the arbitration, the non-dispute portion of the contract continues to implement except the arbitration part.
Packaging Detail:Wooden pack and standard export package |
Delivery Detail:thirty days after comfirming the order |