For high speed railway larger image Bridge girder launcher
Bridge girder launcher, 1.900t lifting capacity, 2.Reasonable design, 3.Reliable quality, 4.For high speed railway - details see: https://www.machineto.com/for-high-speed-railway-larger-image-bridge-girder-launcher-10102109
Feature:Bridge Crane | Condition:New | Application:high speed railway construction | Rated Loading Capacity:900t |
Max. Lifting Load:900t | Place of Origin:Henan China (Mainland) | Brand Name:AKL | Model Number:AKL-CE-50/160 |
For high speed railway larger image Bridge girder launcher
(1)Main feature
- safety control system, reliable by using electric and hydraulic. Concentrating the control system with over-pressure protection, and with all position limit device
- light self weight, easy to assemble, especially for curve bridge
- span-shift can be finished from 32m to 24m by moving the support legs, very conveniently
(2) construction sequences
step 1: the transporter carry precast girder to launching gantry
step 2: the trolley lift the girder
step 3: the precast girder is totally lifted by two trolley
step 4: install girder
(3)Function table for outriggers of bridge girder launcher under working condition
Working condition | Back outrigger | Front outrigger | Auxiliary outrigger |
Movement of complete machine | travelling wheel of back outrigger runs on temporary track paved on bridge floor | remove anchoring between front outrigger and top of pier, hydro-cylinder inside recovers, break away from top of pier | hydro-cylinder jacks, bottom trolley runs on track of launching nose |
Bridge girder erection | cylinder in back outrigger jacks, travelling wheel breaks away from track, load-carrying wheel box presses on hinge seat with hard sleepers safeguard | Support the front section of abutment ahead, the front outrigger support on above breast wall of abutment | Attach to the launching nose |
Launching nose cross piers | cylinder in back outrigger jacks, travelling wheel breaks away from track, load-carrying wheel box presses on hinge seat with hard sleepers safeguard | Support the front section of abutment ahead, the front outrigger support on above breast wall of abutment | Cylinder recovers, the anti-buckle institution ascends launching nose in the air, bottom walking institution makes launching nose move longitudinally to finish crossing piers |
Shift span | travelling wheel of back outrigger runs on temporary track paved on bridge floor, the distance and position of front and back outrigger should be guaranteed on running | Upper part is equipped with shift roller driven by shifting span which can realize longitudinal shifting by track on girder cover plate. When front outrigger shifts span, auxiliary outrigger supports on launching nose; when launching nose shifts and changes span, front outrigger is on the top of pier or breast wall at the end of the girder to meet needs of shifting span | It is same with front outrigger |
transfer | Remove bottom connection girder, move it by lifting trolley | Remove parts under upper girder or tuck up folding section of outrigger | Remove bottom trolley |
Packaging Detail:nude packing, container |
Delivery Detail:70 days |