flake ice evaporator 1ton to 30tons
Capacity:10 ton/day,500kg/24hours | Place of Origin:Chongqing China (Mainland) | Brand Name:ICEPOWER | Model Number:ZNPB10T-D/FA |
Ice Shape:Flake Ice | Certification:CE | power supply:3p/380v/50hz or other requirement | material of the evaporator:stainless steel or carbon steel |
Temperature:25 centi-degree | Type:Ice Machine | Refrigerant:R22 , R404a | Style:Single-temperature |
Climate Type:normal |
Icepower flake ice evaporators carbon steel or stainless steel
From 500KGS to 60tons
If you have any need of evaporators, fresh or sea water, used on land or ships, please contact me to get more details.
Specification:
1)Flake Thickness : 1.5-2.0MM
2).Power supply: 3P/380V/50HZ
3).Fully Automatic and safe operation system
4). Daily capacity: 0.5ton flake ice in 24hrs
5). Cooling type: Air-cooled, Water-cooled and evaporative
6). Refrigerant: R22/R404A
7). High quality and high capacity but competitive price.
Icepower ice flake machine plays tremendous role in marine fisheries and aquatic products processing, chemical paint.
Factory advantage:
1) Profession in making flake ice machine;
2) Having own research and development team, achieves the product promptly renewal;
3) Advanced processing facility;
4) High QA control, deliver on time
5) OEM/ ODM is available, till customers are satisfied;
Products advantage:
1) Main components are imported from U.S.A, German, Japan;
2) Most reasonable price compare over with the high quality and performance;
3) Intelligent control by micro-computer, named PLC, which is self-made, ODM available;
4) Cylinder is designed as horizontal motional, reducing the ware-out of the system and gas leak avoided; carbon steel plated by nobelium or 304 stainless steel optional;
5) Screw designed scraper, features low resistance, low consumption, and no noise.
Note: All the parameter will be changed subject to technical innovation without further notice.
Packaging Detail:wooden crate or containerwe will install and test the machine for you before shipping, you just need to connect water pipes and power, meanwhile, the necessary parts and spared parts are offered together free of charge. |
Delivery Detail:20-45days |