Fence welded wire mesh machine for construction
Place of Origin:Hebei China (Mainland) | Brand Name:DAPU | Model Number:DP--2500F | Primary Voltage:380V/220V/415V/440V |
Rated Duty Cycle:50% | Rated Capacity:550KW | Dimensions:8480*3160*1700mm | Usage:Fence welded wire mesh machine for construction |
After-sales Service Provided:Engineers available to service machinery overseas | wire diameter:2.5--6.0mm | mes width:2500mm | mesh opening:50*50--200*200mm |
Fence welded wire mesh machine for construction
Fence welded wire mesh machine for construction
1.This machine adopts synchronous control technique, both welding time and separate-control welding is controlled by PLC, input panel has been divided into two kind, they are touch screen and button. This made the operation more intelligent and rationalization. This machine use electric as its motive power, and it use the step motor hopper, brake motor drive the car to put the weft. And drawing mesh use the step motor. The longitudinal and weft should be pre-cut. The biggest advantage is that can produce different aperture in both longitudinal and weft.
2. Accessorial parts:
Electric control cabinet, straightening and cutting machine, mesh drawing system, mesh repairing machine, bracket.
3. Mainly used for:railway, highway, Bridges, buildings, such as residential fence and shelves, warehouse cage welding
4. Material:low carbon wire, galvanized wire.
5. Main parameter:
Diameter | Welding aperture | Width of mesh | Length of mesh | Welding head | Welding transformer | Welding speed | weight |
2.5-4mm | 50*50mm | ≤2.5m | ≤6m | 48*20mm | 85kva*6 | 35times/min | 4t |
4-6mm | 100*100mm | ≤2.5m | ≤6m | 24*20mm | 85kva*6 | 35times/min | 4t |
Fence welded wire mesh for construction
Packaging Detail:wooden pallet and plastic package in the container.After-sales service: We offer installation and train the workers for the customers.Our guarantee time: one year since the machine was installed at buyer's factory but within 18 months against B/L date. |
Delivery Detail:45 days after receiving the advance payment. |