F-trading supply for crude oil refinery manufacturers of ZL-3 cap 100MT/D

1.Top tech refining and operation, 2.Security 100%, 3.Increase output 5%, 4.Save fuel 20%, 5.CE&ISO14001/9001 - details see: https://www.machineto.com/f-trading-supply-for-crude-oil-refinery-manufacturers-of-zl-3-cap-100mt-d-10228476
Condition:NewPlace of Origin:Henan China (Mainland)Brand Name:F-tradingModel Number:ZL-3
Usage:Lubricant OilVoltage:380VPower(W):120KW/HDimension(L*W*H):3600*6000*2
Weight:140MTCertification:CE&ISOAfter-sales Service Provided:Engineers available to service machinery overseasSize:3600*6000*2
Capacity:100MT/DCetificate:CE&ISO14001/9001Working form:Continuous systemCooling form:Water cooling
Material:Q245RRaw material:Waste oil &pyrolysis oilFabrication:Auto weldingStructual form:vertical
Noise dB(A):≤85   
F-trading supply for crude oil refinery manufacturers of ZL-3 cap 100MT/D
contact supplier for F-trading supply for crude oil refinery manufacturers of ZL-3 cap 100MT/D


F-trading supply for crude oil refinery manufacturers of ZL-3 cap 100MT/D

Details description for crude oil refinery manufacturers of ZL-3 cap 100MT/D

A.The total production consumption

1. Power: 120kw/hour in total (but it is not every device start at the same time).

2. Cooling circuit water: 50m3/hour in total (the water can be recirculated and the more the water flow, the better the cooling down).

3. Fuel for heating:

30——40KG coal for processing one ton raw oil for average.

20——30KG diesel for processing one ton raw oil for average.

3. Space for machine: 3000 square metre----3500 square metre(the smallest space).

4. Workers or shift: 4 to 6 workers which can be divided by two groups.

B. The refining process diagram and drawing ofModel ZL-3

-----The distillation drawing

C.After Service for pyrolysis oil distillation of ZL-3

1. Delivery time- It will be 3 months after we receive the deposit.

2. Installation and Training-Our company will send one technician for each set of machine for guiding your installation, testing the machine and training your workers. And the charge will be USD1500. The installation period shall be 2 months.

D.Real photos

E.Our certifications for crude oil refinery plant

F-trading supply for crude oil refinery manufacturers of ZL-3 cap 100MT/D
Packaging Detail:40HC*16
Delivery Detail:90 days

Related Product for F-trading supply for crude oil refinery manufacturers of ZL-3 cap 100MT/D