EP Conveyor Belt
Condition:New | Type:Gravity Conveyor | Material:Polyester | Material Feature:Heat Resistant |
Structure:Belt Conveyor | Place of Origin:Shandong China (Mainland) | Brand Name:Aolong | After-sales Service Provided:Engineers available to service machinery overseas |
Product Description
EP (Polyester/Nylon) Conveyor Belt
STANDARDS:
GB/T7984-2001, DIN22102, BS490, AS1332, RMA, JISK6322, SABS1173 etc.
Feature
It uses polyester canvas as carcass, and finished through the processes of calendering, firming and vulcanizing, etc.
With the advantages of thin belt with light weight, high tensile strength, fatigue and wear resistance, erosion resistance of water, steam, chemical, good impact resistance, excellent groove formation ability, low elongation, good stability ever heated and long service life, it's the developing trend of fabric conveyor belt. It is mainly used in harsh condition of long distance, heavy-load, high-chemical corrosive etc, it is especially suitable for transporting in moist environment.
TYPES
Besides General-used EP Belt, there are Fire-retardant type, Cold-resistant type, Wear-resistant type, Heat-resistant type, Acid and alkaline resistant type, Oil-resistant type, Antistatic electricity type, and etc.
Fabric Materials | Fabric structure | Fabric code | No. of fabric plies | Width mm | Length mm | Cover thickness | ||
Warp | Weft | Top | Bottom | |||||
Polyester canvas | polyester | nylon | EP100 | 2-10 | 350-2200 | 100000 | 3.0-6.0 | 1.5-3.0 |
EP150 | 2-10 | 350-2200 | 100000 | 3.0-6.0 | 1.5-3.0 | |||
EP200 | 2-10 | 350-2200 | 100000 | 3.0-6.0 | 1.5-3.0 | |||
EP250 | 2-10 | 350-2200 | 100000 | 3.0-6.0 | 1.5-3.0 | |||
EP300 | 2-6 | 350-2200 | 100000 | 3.0-6.0 | 1.5-3.0 | |||
EP400 | 2-6 | 350-2200 | 100000 | 3.0-6.0 | 1.5-3.0 | |||
EP500 | 2-6 | 350-2200 | 100000 | 3.0-6.0 | 1.5-3.0 | |||
EP600 | 2-4 | 350-2200 | 100000 | 3.0-6.0 | 1.5-3.0 | |||
Note: On the basis of consumers demand adopting standard of JISK6322, DIN22102, BS490 etc. |
Packaging Detail:Plastic Sheeting |
Delivery Detail:Within 20 days after receipt the down payment |