engine oil to diesel equipment/used oil to diesel oil recycling distillation machine
Place of Origin:Henan China (Mainland) | Brand Name:Jinyuan | Model Number:xy-1 | Power(W):8-18kw/h |
Dimension(L*W*H):about 30m*10m*6m | Weight:25-30 tons | Certification:CE,SGS,ISO | After-sales Service Provided:Engineers available to service machinery overseas |
capacity:5-10 tons | oil yield:40%-45% | Warranty:1-2-year | Condition:New |
General introduction
Shangqiu Jinyuan Machinery equipment Co., Ltd, located in Henan province,is the first profession domestic company in the manufacturing and recycling of waste resources.
Holding several items of China national patents (No.: 200720091524.1,etc.),CE(No.:001460.1C2), ISO9001:2008(NO.:08910Q21324ROM) and ISO14001:2004NO.08910E2026ROM)
Specifications of the machine
a, Fuels-Heating System (coal, wood, natural gas, fuel oil as fuels)
1, Environment-Friendly.
2,High Efficiency Cooling Condensers.
3 ,Raw Materials: Crude oil, tyre oil, plastic oil, used engine oil, etc.
b, Features
1, Effective Emission Control with our gas scrubbing system
2,Safety: Release valve for gas release
Rupture disc to protect chamber from explosion
c. Facilities
Power: about 12kw
Total Space needed: 10m×30m
Water Required (Recycled): 40MT (about)
CE certification
Distillation machine on shipment
Mounted distillation equipment from customer's place
Flowchart of Distillation
After-sale service:
1.Quality warranty period: One year warranty for the chamber of the distillation machines,and lifetime maintenance for complete set of machines. pay the double air tickets, accommodation and food.
2.According to the requirement of the buyer, our company sends engineers for installation and commissioning in buyer's site including the training of skills of buyer's workers on operation, maintenance, etc.
3. Supply layout according to buyer's workshop and land, civil works information, operation manuals, etc. to the buyer.
Plastic oil before and after distillation
Packaging Detail:40'FR or 40'HQ |
Delivery Detail:within 15 days after the first deposit |