Electric Resistance Welded Pipe Production Line
Condition:New | Place of Origin:Jiangsu China (Mainland) | Brand Name:SM | Model Number:HG114 |
Welding Mode:High-frequency straight seam | Welding Diameter:114-219mm | Usage:pipe making | Voltage:380V |
Certification:CE,ISO | Warranty:12 months | After-sales Service Provided:Engineers available to service machinery overseas |
Electric Resistance Welded Pipe Production Line
I. Summary
The mill is intended for manufacturing of round pipe of Φ50.8mm-Φ101.6mm with thickness of 1.0mm–3.5mm from cold-rolled and hot-rolled coil strip by means of unclosed tubular blank with its subsequent welding into tube, edge heating by means of solid state high- frequency welder, longitudinal seam welding in rolls of tube welding machine, cooling, further sizing or shaping and on-stream cutting of endless tube in measured lengths.
Finished product will be of round, square or rectangular pipe.
II. The technical flow of the production line
{SteelTape}→→ Double-head un-coiler →→Strip-head Cutter and welder→→
Cage Loop →→Forming section(Flattening unit +Main driving unit +Forming unit +Guide unit +High frequency induction welding unit +squeeze roller)+ De-burr frame→→Zinc Pinting machine →→Cooling unit →→ Sizing unit and straightener →→Flying saw under computer-control →→ Run-out table
III. Basic conditions:
a) Steel Pipe Specification
1. Round Pipe diameter: Φ50.8 –Φ101.6mm
Pipe Thickness: 1.0 – 3.5mm
2. Square & Rectangle Pipe: 40X40mm –80X80mm
Pipe Thickness: 1.0 – 2.5mm
3. Pipe Length: 6.0m – 12.0m
4. Length Tolerance: 0-6mm
b) SteelTape Specification
1. Material: Carbon steel (δb≤500Mpa, δs≤235Mpa)
2. Steel Tape: Inner diameter: Φ450-530mm
Outer diameter: Φmax=1600mm
Strip steel width: 160mm-360mm
Strip steel thickness:1.0mm-3.5mm
The maximum weight: 4.0 tons
c) Electricity
1. Dynamic power: AC380V±10%, 3phases, 50Hz±1.0%
2. Control Power: AC220V±10%, one phase, 50 Hz ±1.0%
d) Electric installed capacity: appro.600KW
e) Cooling water
Packaging Detail:wooden case for export |
Delivery Detail:within 25 days after receiving advance payment |