Electric High Quality Construction Tool Work Platform
Place of Origin:Jiangsu China (Mainland) | Brand Name:Balance | Model Number:ZLP500 | After-sales Service Provided:Engineers available to service machinery overseas |
Material:Steel, Aluminum Alloy | Color:Red, Yellow, Blue, etc | Surface Treatment:Powder coating, Hot galvanization | Length:2m, 2.5m, 3m, 5m, 6m, 7.5m, etc |
Power:1.5kw, 1.8kw, 2kw | Rated Loading Capacity:150kg, 250kg, 500kg, 630kg, 800kg, 1000kg | Voltage:Electric Construction Tool Work Platform accept different voltages | Application:High-rise building, Large tank, Chimney, Dams, Bridges, Derrick, etc |
Special platform:Can be customized and supplied | Certification:ISO, CE |
Electric High Quality Construction Tool Work Platform
Breif introduction
ZLP seriesElectric High Quality Construction Tool Work Platformis a new decorating machinery, which can replace the traditional scaffold and is mainly used in decorating, cleaning and maintenance of external walls of high buildings, such as cement coating, wall brick coating, painting, glass installing, ship building and repairing, big vessels, bridges, dams, chimneys, etc. Using Balance suspended platform can reduce work intensity and raise work efficiency.
Balance brand ZLP series temporarily installed suspended platform is a suspended manned facility for work at heights by relying on a movable platform driven by motor, designed to suspend along the vertical surface of building by steel wire ropes through the suspension mechanism placed at the top of building. It is a kind of non-regular suspended platform.
The main purposes of the suspended platform are:
1. Exterior wall construction and decoration of high-rise building, installation of panel wall and structural members of exterior wall.
2. Repair, maintenance and cleansing of exterior wall of high-rise building.
3. Construction, inspection, repair and maintenance of large project, for instance: chimney, dam, bridge and head frame.
4. Welding, cleansing and oil-painting of large ship.
5. Fabrication and installation of bulletin board on buildings at heights.
Parts contains:
1. Suspended Cage: Steel or Aluminum Alloy (powder coating or hot galvanization)
2. Suspension Mechanism: Steel (powder coating or hot galvanization)
3. Electric hoists: LTD6.3 or LTD8
4. Safety Lock: LSF30
5. Electric control box: Schneider brand
6. Steel wire rope: 8.3mm or 9.1mm
7. Power cable: 2.5 mm²
8. Counterweights: Cement or Cast Iron
9. Spare parts
Parameters of Electric High Quality Construction Tool Work Platform:
Model | ZLP250 | ZLP500 | ZLP630 | ZLP800A | ZLP800S |
Material | Steel or Aluminum Alloy | ||||
Rated Capacity(kg) | 250 | 500 | 630 | 800 | 800 |
Lifting Speed (m/min) | 9-11 | 9-11 | 9-11 | 8-10 | 8-10 |
Motor Power (kw) | LTD5 | LTD5 | LTD6.3 | LTD8 | LTD8 |
Platform Length (m) | 2.5 | 5 | 6 | 7.5 | 7.5 |
Counterweights (kg) | 625 | 750 | 900 | 1000 | 1000 |
Diameter of Wire rope (mm) | 8.3 | 8.3 | 8.3 | 8.6 | 8.6 |
Standard lifting height (m) | 100 | 100 | 100 | 100 | 100 |
Products photos:
Application:
1. High-rise building: Decoration, construction for external wall, installation of curtain wall and external components, repairing, checking, maintenance and cleaning for external wall
2. Large-scale project: construction, repairing and maintenance for large tank, chimney, dams, bridges, derrick
3. Large ships: welding, cleaning and painting
4. billboard: installation billboard for high-rise building
Quality Control & Packing:
Certificates:
Superiority:
1. We had already passed the authorization by ISO9001:2008 and CE and established a complete set of quality assurance system.
2. Under such a complete set of quality assurance systems, there is a complete set of regulations for ordering, order handling, quality design, purchasing raw materials, working out production plan, production, test and inspection, packaging, storage, delivering, trace, keep in touch with clients, etc.
3. The CNC control center and PC-based production and marketing system not only improves the working efficiency but also assures the products quality.
4. Our test lines are equipped with a large amount of online test instruments, so that they can ensure and improve the products quality.
5. We also have a complete set of equipment and techniques for testing and controlling the performance of products, which ensures our Electric High Quality Construction Tool Work Platform to take a leading position among the fellow products at home and reach the international standard.
Packaging Detail:Pallet, Plywood box, Steel strip, Containers available, according to the model and quantity.20'ft container put 9-10 sets and 40'ft container put 12-14 sets. |
Delivery Detail:10-15 days upon receipt of the payment |