dry powder mixing machine with CE
1. dry powder mixing machine, 2. Capacity from 10L to 80L., 3. Bowl production grid., 4. All parts from Europe - details see: https://www.machineto.com/dry-powder-mixing-machine-with-ce-10035340
Place of Origin:China (Mainland) | Brand Name:AOCNO | Model Number:ACN-PM 10L | bowel capacity(L):10-80L |
dry powder mixing machine
Description:
* Suitable for making bread, butter ,egg, sugar, sauces, paste and so on.
* Heavy gauge stainless steel bowl, three tools:whisk, dough hook, and flat Beater
*Multifunction; Capacity from 10L to 80L.
* Automatic over-current protection
*Emergency stop button
*conformity with EC norms.
*All parts from Europe
dry powder mixing machineSpecification:
Model | ACN-PM 10L | ACN-PM 20L | ACN-PM 30L | ACN-PM 40L | ACN-PM 60L | ACN-PM 80L |
bowel capacity(L) | 10 | 20 | 30 | 40 | 60 | 80 |
Machine Size (mm) | 430*440*670 | 520*530*830 | 620*620*1020 | 620*640*1070 | 780*850*1340 | 830*900*1410 |
packing size (mm) | 550*570*830 | 580*680*990 | 750*750*1210 | 750*750*1210 | 870*1040*1570 | 870*1070*1670 |
Voltage Frequency | 220V/380V | 220V/380V | 220V/380V | 220V/380V-3ph | 220V/380-3ph | 220V/380V-3ph |
Power (kw) | 0.23 | 0.38 | 0.75 | 1.13 | 2.25 | 3.75 |
N.W.(kg) | 57 | 83 | 150 | 162 | 360 | 394 |
G.W.(kg) | 79 | 110 | 193 | 205 | 400 | 432 |
Revolution speed(r/m) | 46/100/156 | 41/90/162 | 40/80/156 | 40/80/156 | 24/42/68 | 24/42/228 |
Rotation | 156/340/530 | 131/288/518 | 120/240/468 | 120/240/468 | 80/141/228 | 80/141/228 |
Dough | 0.75 | 1.8 | 3.7 | 5.6 | 11 | 14 |
batter | 1.5 | 3 | 4.5 | 6 | 10 | 13 |
Fillings | 1.5 | 3 | 4.5 | 6 | 10 | 13 |
dry powder mixing machineproduction:
$zhanwei$making birthday cake:
dry powder mixing machine package:
Packaging Detail:After finishing the production, we will clean and packed it before it is qualified by the QC manager. First we will put drying desiccant inside the machine (protect the machine from wet damage during the transportation), then put 6mm cystosepiment outside it and upgrade the thermal contracting film. Finally we will put wooden case and steel belt. We will upgrade again according to different machine to protect the damage of the machine before loading the container. |
Delivery Detail:within 7 days after the down payment |