Double-side pressure 3-roller calendar/calender/calendaring/calendering machine

It's used to do the calendering of cotton, chemical fiber, wool and its blended fabrics. - details see: https://www.machineto.com/double-side-pressure-3-roller-calendar-calender-calendaring-calendering-machine-10278445
Place of Origin:Jiangsu China (Mainland)Brand Name:BroadenwinModel Number:1800mm 2000mm 2600mm 2800mm 3200mm 3600mm 4200mm 4800mm 
Double-side pressure 3-roller calendar/calender/calendaring/calendering machine
contact supplier for Double-side pressure 3-roller calendar/calender/calendaring/calendering machine


This product is applied to do the calendering of cotton, chemical fiber, wool and its blended fabrics.

The middle roller of the equipment si fixed roller, top and bottom rollers can respectively to the intermediate pressure. When the fabric pass the machine, it can be calendered once or twice. After calendered, the fabric can achieve extremely good brightness and softness. The equipment can save a lot of costs.

NOItemContents
1PatternVertical 3 rollers. The top roller and the bottom roller are soft rollers, the middle roller is the heating steel mirror roller.
2Width1800, 2000, 2200, 2400, 2600, 2800, 3000, 3200, 3400, 3600, 3800, 4000, 4200, 4400, 4400, 4600, 4800, 4800, 5000
3Running Speed5-50m/min
4Max pressure between rollers60T, 80T, 100T, 120T
5Operating temperature of mirror roller≤220°C

Factory Overlook

Certificates

Workshop

Enterprise Management

Service Process

A. To introduce the characteristics of products, slove the questions raised by customers in brief and record the special requirements of customers.

B. To supply several solution to customers for reference according to the requirements of customers and offer prices depending on different solution.

C. To decde the final scheme and sign the contract.

D. According to the final Scheme, organize the operation and offer customers the installation drawing. Send the engineer to prospect on spot, if necessary.

E. After the equipment arrives on site, our engineer shall provide a free instruction in erection on site, debugging after installation and technical training.

F. After we received the telephone from customers, we will try our best to instruct customers to solve the problem; if customers really cannot knock over the engineers shall arrive on site a minute earlier as soon as possible and prevent from fear of disturbance in the rear:

In China a. Within 500 kilometers, the engineer arrives within 24 hours at the latest;

b. Within 1000 kilometers, the engineer arrives within 48 hours at the latest;

c. Beyond 1000 kilometers, the engineer arrives within 72 hours at the latest;

G. Within the year when the equipment is brought into operation, our after-sales engineers shall repay visits customers at irregular intervals and give suitable suggestions to customers for reference, according to the actual use. Meanwhile, we will ask customers for suggestions for improvement, so that we will make long-term progress in technology.

Double-side pressure 3-roller calendar/calender/calendaring/calendering machine
Packaging Detail:wooden case
Delivery Detail:70 days after the commencement of the order

Related Product for Double-side pressure 3-roller calendar/calender/calendaring/calendering machine