Diesel engine concrete pump DHBT40S-11-56
Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:CO-NELE | Model Number:DHBT40S-11-56 |
Power(W):56 | Weight:4000kg | Dimension(L*W*H):4500*1500*1550 | Certification:CE certificate |
Warranty:1 year | After-sales Service Provided:Engineers available to service machinery overseas | Power:Diesel engine VOLVO | Main oil pump:HAWE/Rexroth/Kawasaki |
Diesel engine concrete pump DHBT60S-13
1. Power: original German VOLVO or Deutz diesel engine
2. Main oil pump: original German HAWE or Kawasaki from Japan
3. Seal parts: American Parker
4. Main electric parts: original Schneider, Omron or LG electric components
5. Manual pressure switch: equipped
6. Pipe joints: American Eaton
7.150 m pipeline, spare parts and tools
Item | Unit | Parameter | ||
Performance | Max. theoretic concrete delivery volume | m3/h | 40 | |
Max. theoretic delivery pressure | MPa | 11 | ||
Max. theoretic delivery height | horizontal | m | 190 | |
vertical | m | 570 | ||
Type of distribution valve | S tube valve | |||
Concrete cylinder specification | mm | Φ200×1200 | ||
Main oil cylinder specification: | mm | Φ140×Φ90×800 | ||
Hydraulic oil tank volume | L | 300 | ||
Hopper capacity | m3 | 0.6 | ||
Discharging height | mm | 1400 | ||
Output opening diameter | mm | Φ150 | ||
Inner diameter of concrete delivery pipe | mm | Φ100/Φ80 | ||
Power system | Diesel engine power | Kw | 56 | |
Main oill pump | K3V112S | |||
Hydraulic system | Type of Hydraulic oil circuit | Open circuit | ||
Maximum oil pressure of main system | MPa | 28 | ||
Maximum oil pressure of mixing system | MPa | 14 | ||
Max. mixing speed | r/min | 24 | ||
Other parameters | Concrete slump | mm | 80-200 | |
Allowable max. aggregate diameter | mm | Pebble40, crushed stone30 | ||
Dimension (length×width× height) | mm | 4500×1500×1550 | ||
Weight | kg | 4000kg | ||
Speed in transit | Km/h | ≤8 |
Packaging Detail:In nude package. One 20'GP container can hold 1 set. One 40'GP container can hold 2 sets. |
Delivery Detail:Within 15 days after receipt of the deposit |