Derrick
Feature:Tower Crane,Other | Condition:New | Application:Details up to the actual case. | Rated Loading Capacity:Details up to the actual case. |
Rated Lifting Moment:Details up to the actual case. | Max. Lifting Load:Details up to the actual case. | Max. Lifting Height:Details up to the actual case. | Span:Details up to the actual case. |
Place of Origin:Fujian China (Mainland) | Brand Name:JS or OEM | Model Number:according to the drawing |
a) Since 1998
b) Location: seaside city Quanzhou in south-east China, 1.5 hours drive from Xiamen
International Airport or 1 hour s drive from Quanzhou Domestic Airport
c) Total Staff: 736 people
d) Certificate:ISO9001:2008 and 500KV power transmission line tower production license
e) Equipment: 11CNC production lines and 2 sets of 13.5m spelter bath
f) Anti-Corrosion:Hot-dip galvanization as per ISO 1461 or ASTM A123
g) Welding: CO2welding or Submerged arc auto methods
h) Products: power transmission steel tower, telecom steel tower,TV/radio
broadcasting steel tower, drilling well tower, and similar steelstructures for substation,
plant workshop etc
i) Experiences:Bangladesh(Desco), Sudan, the Philippines(Transco), India(Reliance), Sri
Lanka(Lanka Bell), Indonesia(PLN),Ghana, Sierra Leone, Tanzania, Ethiopia.
Our motto is :Quality is the life blood of the company, therefore, We have been making every effort to provide high quality Derrick.One the one hand,auto-cad and prototype software are applied inprototype to ensure the precision of workshop drawings. A sample towerwill be made for inspection before mass production. In mass production,we adopt advanced ERP management software to monitor the precisemanufacturing progress of towers, to ensure each piece qualified. Onthe other hand, we equip our mechanical and chemical Labs with modernfacilities, so that many routine experiments, such as Bearing Stress,Preece Test, Stripping Test and Five Elements Analysis etc, can becarried out smoothly,so as to ensure that our finish products meet withthe ASTM or ISO standards.
Packaging Detail:Steel tower will be packed into several bundles whose weight is 2~3MT. |
Delivery Detail:Details up to the actual case.Generally, 1000 MT every 10 days. |