DCW-4800 Full-auto high-speed baby diaper machinery
Full-auto high-speed baby diaper machinery, 1. 40-100pcs/pack, 2. This machine is the speciality of our products - details see: https://www.machineto.com/dcw-4800-full-auto-high-speed-baby-diaper-machinery-10326932
Place of Origin:Fujian China (Mainland) | Brand Name:DaChang | Model Number:DCW-4800 | Main form of machine:stainless steel |
Raw material roller:20-50rolls | Production Speed:4800-10000pcs/min |
DCW-4800 Full-auto High-speed baby diaper machinery main technical parameter | |
Motive factor | 28KW |
Power supply | 380V, 50HZ |
Suitable material | Spun-lace non-woven fabrics, Hot-rolling non-woven fabrics. |
Quality of material | 40g/~60g/ |
Production size(unfolded) | (150-250mm)*(180-220mm)(L*W) |
Production size(folded) | (150-250mm)*(80-110mm)(L*W) |
Production speed | 4800-10000pcs/min |
Raw material size | Φ1200*180-250mm (Dia*W) |
Folding way | Pop up or Non pop up |
Counting way | Auto-counting, quantity changeable pile system |
Humidification agitating system | Double agitating |
Control system | PLC control system, color touching screen |
Machine size(mm) | 32000*3200*2500(L*W*H) |
Water tank size(mm) | 2000*1100*1900 250KG |
Weight of machine(kg) | 19000KG |
Main technical parameter of KGT-340 baby diaper machinery packing machine | |
Power supply | 380V, 50HZ |
Motive factor | 6KW |
Production speed | 30~50 packages/min |
Production size (mm) | (180-320)*(80-120)*(30-70)(L*W*H) |
Controllable package making machine | Insert angle equipment |
Electric auto-follow, date printing, punching, labeling | |
Control system | Color touching screen, PLC control system. |
Net weight of machine | 2000KG |
Machine size | 5280*1000*2100 mm (L*W*H) |
The working procedure | |
Folding and stacking parts: raw material folding wetting stacking counting feeding to packing machine | |
Packing part: packing film punching label small label product begin forming at formet center seal and cutting product output |
Packaging Detail:Standard seaworthy wooden case |
Delivery Detail:90-120 days when get your advance payement |