CS PU foam painting machine for arch span building
Place of Origin:Liaoning China (Mainland) | Brand Name:Changsheng | Model Number:CS | Main frame:1 set |
Spray gun:1 set |
CS PU foam machine GEN I
Standard Configuration
Mainframe: 1 set
Spray gun: 1 set
Heating and preserved pipe: 15m
Connecting pipe for spray gun: 1.5m
Transfer pump: 2 sets
Technical Parameter:
Academic max. output of material pump:9.5kg/min(21b./min)
At operating pressure material output: 4~8kg/min
The highest heating temperature: 80°C
Heating device power for material: 3000w x2(or 4500w x2optional)
Heating power for pipe heating preservation: 3500w
Single material output output pressure:11Mpa(1600psi)
Max. Pipe length: 90m(300Ft)
The highest heating temperature: 80°C
Air source requirements: 0.9m3/min 0.7Mpa(33cfm,100psi)
Electrical requirements: 3-phase, 4-line 380v, 50/60Hz, 9Ax3+15A
CS PU foam machine GENS II
Standard Configuration
Mainframe: 1 set
Spray gun: 1 set
Heating and preserved pipe: 15m
Connecting pipe for spray gun: 1.5m
Max.Pipe length:45m
Transfer pump: 2 sets
Technical Parameter:
Electrical source: 220v 7000w
Air source:0.5~0.8Mpa(70~120psi) ≥ 0.9m3/min
Output: 4~8kgsmin
Heating device power for material: 2500w ×2
Heating power for pipe heating: 2000w
Single component output pressure: 5~10Mpa (700~1500psi)
CS PU foam machine GEN III
Standard Configuration
Mainframe: 1 set
Spray gun: 1 set
Heating and preserved pipe: 15m
Connecting pipe for spray gun: 1.5m
Transfer pump: 2 sets
Technical Parameter:
Electrical source: 220v 7000w
Air source:0.5~0.8Mpa(70~120psi) ≥ 0.9m3/min
Output: 2~6.8kg/min
Heating device power for material: 2500w ×2
Heating power for pipe heating: 2000w
Single component output pressure: 5~10Mpa (700~1500psi)
The range of the ratio: 1:1~2:1
Packaging Detail:Pakaged |
Delivery Detail:In stock |