Coral Wafer machine SHR-65
Place of Origin:Guangdong China (Mainland) | Brand Name:CORAL | Model Number:SHR | Type:Food processing machine |
After-sales Service Provided:Engineers available to service machinery overseas | Capacity:5.5 tons | Delivery period:60-90 days | Payment method:T/T, L/C |
Quality Guarantee Period:12 months | Power source:Gas or Electricity |
(1) Descriptions
Coral Full- automatic 65 model wafer production line with 2 kinds of models, one isGas Heating, the other isElectric Heating. There are a lot of capacity for the customers to choose. Pls see the diagram as follows:
Type/plates | 27 | 33 | 39 | 45 | 51 | 63 | 75 |
Electricity | 120KW | 140KW | 160KW | 180KW | 200KW | 240KW | 280KW |
Daily capacity(24hours) | 2.0 tons | 3.0 tons | 3.5 tons | 4.0 tons | 4.5 tons | 6.0 tons | 7.5 tons |
Type/plates | 27 | 33 | 39 | 45 | 51 | 65 | 75 |
Electricity | 13kg/h | 15kg/h | 19kg/h | 23kg/h | 27kg/h | 32kg/h | 37kg/h |
Daily capacity(24hours) | 2.0 tons | 3.0 tons | 3.5 tons | 4.0tons | 4.5 tons | 6.0 tons | 7.5 tons |
(2)Product Meterial
1. 304 Stainless Steel ,
2. Imported SEW Motor Germany
3. Germany SKF
4. Japan Mitsubishi or Germany Simens Touch Screen
5. Japan Panasonic
6. Italy “Changshi fire” Brand
7. Denmark “Danfoss” Brand
8. America “Valley Round” Brand.
(3) Our services
Payment Trems
30% of Invoice value should be paid by T/T after signing the Contract;
70% of Invoice value should be paid by T/T or L/C before the goods leave the Seller’s factory.
Installation and Commissioning
The manufacturer will take charge for the installation and commissioning. But the labor cost (50USD/DAY) and round–trip flight ticket /food/hotel/local transport/personal insurance and other cost of the technicians are for the buyer’s account.
The user shall provide common tools for installation and debugging and the purchaser shall be responsible for special tools (if required).
Training for Operator and maintainer
The training for operator and maintainer are normally carried out by manufacturer during and after installation and commissioning by our commissioning technician. Manufacturer will try their best to give both operators and maintainer a full understanding and make both of them can successfully operate and maintain the equipment.
Quality Guarantee
The wafer production line is covered by the manufacturer’s guarantee for a guarantee period that lasts twelve months commencing from the date of the <Certificate of Acceptance> signed by buyer after installation and commissioning finished of the line. However, not exceeding fifteen months after the date of arrival in port of destination.
Shippine Time:
90days upon receipt of deposit
Plates Size :
470*325(mm),470*350(MM),500*350(mm)
(4) Machines Pictures
>>Baking oven
>>Creaming machie
>>Cutting machine
Certificate
Packaging Detail:Iron tray and frame with plastic cover in container |
Delivery Detail:90 days |