copper gold leaching equipment

gold leaching equipment, 1.ISO certificate, 2.20 year experience, 3.less power consumption, 4.Improve slurry circulation - details see: https://www.machineto.com/copper-gold-leaching-equipment-10312722
Type:Leaching TankPlace of Origin:Henan China (Mainland)Brand Name:HCModel Number:SJ
pre-service:freeinstallation:under our engineer guidewarantee:12 monthsafter-sale service:for whole using life
weight:2100-5200 kgpower:2.2-5.5volume(m3):6-32.7impeller speed(r/min):41-52
copper gold leaching equipment
contact supplier for copper gold leaching equipment


copper gold leaching equipment

General introduction copper gold leaching equipment

copper gold leaching equipment is the necessary equipment in the flotation processing, which is mainly used in slurry mixing. It makes the ore particles in the condition of suspension to touch and mix with chemical agent completely, so as to set the stage for ore dressing.

Application of copper gold leaching equipment

copper gold leaching equipment is widely applied to ferrous and non-ferrous metal beneficiation plant, chemistry, slurry mixing, cyanide plant and sewage treatment plant.

Feature of copper gold leaching equipment

1. Impeller diameter and impeller speed increased, and the umbrella impeller design, enhanced the ore slurry and medicine agitating capacity.

2. Agitating capacibilities improved the cycle ability of the ore slurry and medicine has also been strengthened.

3.There is a downward pressure during umbrella impeller operation, which in turn accelerated the pumping capacity of the ore slurry, so that the ore slurry and medicine recycling capacity further strengthened.

4. There is a spray under the diversion, the ore slurry and medicine flow into it, recycling capacity further strengthened.

Technical Parameters copper gold leaching equipment

Model

Tank Size

Volume

(m3)

Dimension

(mm)

Weight

(kg)

Dia.

(mm)

Hight

(mm)

Dia.

(mm)

Speed

(r/min)

ModelPower

(kw)

XB-1000100010000.58250530Y90L-41.51130×1130×1497436
XB-1200120012001.0300390Y112M-62.21450×1210×1635685
XB-1500150015002.2400320Y132S-631830×1512×2126900
XB-2000200020005.6550230Y132m-65.52526×2916×28001670
XB-25002500250011.2650210Y200L-618.53096×2696×35263440
XB-30003000300019.1700210Y200L-618.53604×3270×36104613
XB-3500350035003085023OY200L-6223940×3740×49707280

related copper gold leaching equipment picture

the delivery of copper gold leaching equipment

copper gold leaching equipment in factory

copper gold leaching equipment in delivery

copper gold leaching equipment
Packaging Detail:standard packing
Delivery Detail:15-25 days

Related Product for copper gold leaching equipment