cooling tower(water cooling tower,frp cooling tower,square cooling tower,combine cooling tower,cooling equipment)
Material:Metal | Place of Origin:Shandong China (Mainland) | Model Number:YDFN series | Brand Name:FUYALID |
Product Type:Cooling Tower | Capacity Type:Medium Duty |

YDFN frp water cooling tower quality characteristic
The thermal properties are high
Selects the patent to pour water on the padding, the large diameter air blower, the new ABS multi-laminar nozzle, the streamline shape wind tunnel, the low resistance to receive the water, has guaranteed the DFN cooling tower highly effective heat transfer performance.
The operating cost is low
Selects the energy conservation large diameter air blower, the amount of wind is big, the power is small, the energy consumption is low, saves the operating cost effectively for the user; May select the multispeed electrical machinery according to the user request, can act according to the ambient temperature the change adjustment amount of wind, further reduces the operating cost.
Environmental protection low chirp
The slow-speed of revolution air blower, tempted the river character noise elimination pad, the streamline shape to receive the water effective control DFN cooling tower high to the environment the influence.
Artistic durable
Tower-shaped artistic, with building perfect fusion; The surface layer uses the import colored rubber clothes, contains the ultraviolet ray absorbent, the bright and clean like mirror, the anti-aging, difficult to fade. May according to the user request choice tower body color.
The tower body is dexterous
Uses the FRP compound materials massively, take the hot dipping zinc light steel products as the skeleton, optimization design becomes after Solid Edge the CAD.
Maintains conveniently
The stave sheet uses the unique hanging installment, the non-bold fastening, maintains conveniently. DFN-200 cooling tower replacement padding time-consuming less than one day.
The pattern is diverse
Has the standard type, to control, ultra low chirp, frostproof, the industry cooling tower to choose warm for you, adapts the different operation requirements.
Single appearance plans
Many parallel outline drawings

Packaging Detail:plywood box |
Delivery Detail:10-25days |