Continuous Fryer
Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:DARIN | Model Number:CF Series |
Power Source:Electric | Voltage:380V 50Hz | Power(W):36kw | Weight:800kg |
Dimension(L*W*H):6000x650x2450mm | Certification:CE | Warranty:1 year | After-sales Service Provided:Engineers available to service machinery overseas |
Material:Stainless Steel 304 | Feature:Automatic & continuous | Manual:Englih version | Spare Parts:1 set |
Layout:AutoCAD layout according to client's workshop | After-sales Service:Full life | Support Equipment:Supplied as complete frying system | Temperature:Adjustable |
Filter:Supplied to reduce oil consumption |
Continuous Fryer, Automatic Fryer, Continuous Frying Machine
Introduction
Continuous Fryer is used for frying hamburger patty, chicken nuggets, chicken or beef steak, pumpkin patty, which are suitable for KFC or McDonald.
Key Equipment Show
Features
Advanced oil-water massify technology and auto filtering function which greatly prolongs the oil usage life.
No need frequently changing oil, much saving cost.
The temperature is automatically controlled.
Advanced mechanical allocation and controlling, keeps the machine at continuous good performance.
High efficiency heating system greatly avoids energy waste.
Fully stainless steel 304.
Technical Parameters
Model | CF-200 | CF-400 | CF-600 |
Power | 36kw | 120kw | 150kw |
Capacity | 100kg/hr | 300-500kg/hr | 1000-1200kg/hr |
Frying Time | 25-60S | 25-60S | 25-60S |
Belt Width | 200mm | 400mm | 600mm |
Dimension | 2800x450x1800mm | 6000x650x2450mm | 6000x960x2640mm |
Samples
Delivery
Commissioning & After-sales Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After receiving firm order and down payment, we start to apply for the Visa to your country immediately; while the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line..
5. Our engineers can provide basic formula for the production, and help the customer to produce good quality food according customer’s detailed formula.
6. It normally costs 10-14 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
Exhibition Fairs
Packaging Detail:Fumigation wooden cases, which are well sealed and strong enough for long-term trip, and suitable for multi-times loading & unloading by forklift. |
Delivery Detail:45 days |