Concrete Cooling Systems

Concrete Cooling Systems consists of containerized ice plant,water chiller,automatic ice storage,delivery device,weighing hopper - details see: https://www.machineto.com/concrete-cooling-systems-10079822
Place of Origin:Fujian China (Mainland)Brand Name:SnowkeyModel Number:FIP / AISCertification:CE / ISO 9001 / ISO14000
Power:AC 380 3pH 50/60HzMax water inlet temperature:45℃Ice outlet temperature:-7℃Water-out temperature:≤0.5℃
Running hour:24hrAmbient temperature:50℃Ambient wet bulb temperature:30℃Refrigerant:R22/R404A/R717
Concrete Cooling Systems
contact supplier for Concrete Cooling Systems


Complete concrete cooling system

Fujian snowman co. ltd, Founded in 2000, growing up step by step, and become a globalization enterprise specialize in produce ice machines, cooling equipment and cold storage, especially in ice machines and concrete cooling system field, the market share in this field, SNOWKEY is the top 1 in China, and in leading position around the world.

We have more than 1000 units concrete cooling systems working around the world, our projects build in every corner of the world, such as: Al halifa tower--the world toppest building in Dubai, south to north railway construction project in KSA, city light railway in Makkah KSA, Doha port, Sanmen unclear power plant in Zhejiang province China, unclear power plant in Qinshan China, unclear power plant in Haiyang China, Hydropower plant in Guandi China, hydropower plant in Brazil etc.

Why shall be used concrete cooling system?

On the process of concrete condensation and rigidification, hydrated cement produced large amount of hydration heat, when heat accumulated, the temperature increase inside the concrete will become rapider, the concrete structure is thick and large, which has low thermal conductivity and makes the heat hart to emit, therefore, the temperature difference between inside and outside the concrete is excessive and tensile stress comes up, when the tensile stress excesses the current concrete ultimate tensile strength, the concrete surface will crack.

In order to prevent cracking, maximum temperature inside the concrete should be controlled strictly, one of the methods to controlling temperature is reduce the concrete pouring temperature. therefore, the concrete-out temperature should be limited, in hot season, the concrete-out temperature. in natural conditions is needed, Namely, precooling the aggregate and mixing the concrete with cold water and flake ice to reduce the concrete-out temperature, this is the most effective measure for reducing concrete pouring temperature.


Except controlled the pouring concrete temperature, embeded cold water pipes inside concrete, and filling cold water inside is another method to reduce the temperature inside large scale concrete project.

Complete concrete cooling system general components:
Aggregate cooling system (air cooling system or water cooling system)
Chiller water or post chiller water system(CW≤4°C)
Ice cooling water system (ICW≤1°C)
Flake ice plant(FIP10~180Ton/day)
Ice storage(AIS6~200Ton)
Ice delivery and ice weighing system(TSL.AID.QWT)
water tank and steel frame

Features of the system:

(1) Small size, small area, convenient transportation

(2) Rapid installation, adaptable to adverse surroundings

(3) Fully automatic control, convenient operation and maintenance

(4) easy and convenient to operate, and adaptable to adverse surroundings, works at the ambient temperature ranging from -30.C to 56.C.

Carry-out standard:

1.White painted new container with air conditioner, illumination and aluminum door, meeting the International Organization for StandardizationISOrequirement

2.piston and screw compressor

3.motor IP55 insulation class F

4.1set of evaporative condenser

5.1 set of ice maker with ice level control

6.automatic oil return system

7.water flow controller with ice maker indicator light

8.switch and control panel for automatic operation

9.stainless steel panel with stainless steel meters

10.assemble, pipeline and circuitry meet German standard

Concrete Cooling Systems
Packaging Detail:container
Delivery Detail:45 days after down payment

Related Product for Concrete Cooling Systems