Complete Beneficiation Line / Mineral Separation Line
Condition:New | Type:Sprial Separator | Place of Origin:Henan China (Mainland) | Brand Name:HCM |
Model Number:3000T/D | Application:iron ore, hematite iron ore,magnetite iron ore, limonite iron ore | Warranty Period:1 Year | Service:freely Installation, erection,and commissioning instruction |
Certificate:ISO9001:2000 | After-sale service:for whole using life | Spare parts:supply for 1 year | Pre-sale service:best |
color:As your request | quality:best | Usage lifetime:long operation lifetime |
1. Proving beneficiation technology and consultation
2. Raw ore testing and evaluation
3. Site chosen consultation and evaluation.
4. Site design and layout design.
5. Installation, erection,and commissioning instruction
6. Workers training.
Iron Ore Concentrating plant coversfeeder, crusher, ball mill, classifier, vibrating screen, rocking bed, magnetic separator, mix tank, flotation machine and so on.
The specific IronOre processing plantflow is as follows:
1, The extracted ore should be crushed by jaw crusher initially.
2, When it gets the reasonable fineness, it is transported into ball mill by elevating conveyer and feeder, and is milled by ball mill.
3, The subtle milled ore gets the next procedure: Classification. There is a theory that if the weights of solid particles are different, the sedimentations will be different, and the mixed ore can be classified by screw classifier.
4, The classified ore gets into magnetic separator. Since the specific magnetization coefficients of ores are different, the magnetic substance of mixed ore is separated from others with magnetic and mechanical force. The mineral matter, which has been separated by magnetic separator initially,
5, Transported into flotation machine by conveyer, and different medicines are added according to different characteristics of ore, so that the needed ore is separated from others.
6, Since the separated ore are wet, they should be dewatered by thickener initially, and dried by dryer.
Packaging Detail:1.20GP, 40GP2.spare parts in wooden case |
Delivery Detail:5-15days |