CNC steel rebar mesh welding machine for construction
CNC steel rebar mesh welding machine for construction, 1.wire diameter:5-12mm, 2.mesh width:2500mm, 3.mesh opening:100-300mm - details see: https://www.machineto.com/cnc-steel-rebar-mesh-welding-machine-for-construction-10141312
Place of Origin:Hebei China (Mainland) | Brand Name:DAPU | Model Number:DP--2500G | Primary Voltage:380V/220V/415V/440V |
Rated Duty Cycle:40% | Rated Capacity:1200KW | Dimensions:20*3.6*2.5M | Usage:CNC steel rebar mesh welding machine for construction |
After-sales Service Provided:Engineers available to service machinery overseas | mesh width:2500mm | mesh length:6000mm | mesh size:100--300mm |
wire diameter:5--12mm |
CNC steel rebar mesh welding machine for construction
CNC steel rebar mesh welding machine for construction
1. Steel bar mesh welding machine usesynchronization CNC technology, welding time and separate welding arecontrolled by PLC digital program.
2. It is easy and convenient tooperate with the HMI(touching screen).
3. This machine equipstypical and efficient transformer, which has 8-gear, enlarging the welding range.Professional electrodemakes the wear low; it is used in many sides.
4. The fallen wire systemsends weft wires one by one automaticallyinstead of putting wefts wires by manual work, which increased the productivity.
CNC steel rebar mesh welding machine for construction
Input power | 380V 50Hz | Max. width | 2500mm |
Line wire space | 100—300mm | Cross wire space | 50—300mm |
Wire diameter | 5.0—12.0mm | Rated capacity | 120kva*13 |
Welding point No. | 26 | Motor power | 5.5kw |
Feed line wire | Pre-cut wire | Feed cross wire | Pre-cut wire |
Welding speed | 30—45times/min | Weight | 9000kg |
Dimension(L*W*H) | 20000*3600*2500MM |
Packaging Detail:wooden pallet and plastic package in the container.After-sales service: We offer installation and train the workers for the customers.Our guarantee time: one year since the machine was installed at buyer's factory but within 18 months against B/L date. |
Delivery Detail:60 days after receiving the advance payment |