Class F DMD
Place of Origin:Sichuan China (Mainland) | Brand Name:Coxin | Model Number:DMD | Type:Insulation paper |
Material:Dacron + Mylar + Dacron |
1. Polyester Film / Polyester Nonwoven Fleece Flexible Laminate (6641 class F DMD) is a three-layer flexible laminate, polyester nonwoven fleece(D) is bonded to the two sides of polyester film(M).This product is applicable for slot insulation,interphase insulation and liner insulation in Y electric motors and electrical apparatus.
2. Heat resistance: 150 C
3.Specification:
Properties | Unit | Values | ||||||||||||
Thickness | mm | 0.18 | 0.20 | 0.23 | 0.25 | 0.30 | 0.35 | 0.40 | ||||||
Thickness Tolerance | mm ± | 0.025 | 0.03 | 0.03 | 0.03 | 0.03 | 0.035 | 0.04 | ||||||
Tensile Strength | No bending MD | N/10 mm≥ | 100 | 120 | 130 | 150 | 170 | 200 | 300 | |||||
After bending MD | 90 | 105 | 115 | 130 | 150 | 180 | 220 | |||||||
No bending TD | 90 | 105 | 115 | 130 | 150 | 180 | 220 | |||||||
After bending TD | 80 | 95 | 100 | 120 | 130 | 160 | 200 | |||||||
Breakdown Voltage | Normal | Kv≥ | 8 8 | 9 | 10 | 11 | 13 | 15 | 18 | |||||
155±2°C | 7 | 8 | 9 | 110 | 12 | 14 | 17 | |||||||
Elongation at break | MD | %≥ | 10 | 5 | ||||||||||
TD | 15 | 5 | ||||||||||||
Bonding Property | Normal 180±2°C10min | Kv | No delamination | |||||||||||
No delamination, no leak | ||||||||||||||
4..Packing and Delivery Details
This product is packed in roll form, the inner diameter of every roll is 76mm, the roll weight is 50kg ± 5kg and the width is about 1000mm ± 10mm.The packing and the thickness also can be supplied according to customers requirements.
We use the best quality PET film and polyester nonwoven to make our DMD, especially the nonwoven we use is the best quality among all Chinese manufacturers, cutsomer said: "in China, Coxin's DMD quality is very excellent."
Thickness:0.09mm - 0.45mm
Width:15mm( tape) - 1500mm
Payment Terms: T/T, L/C
Minimum Order: 200kgs
Lead Time: 20 days
Packaging Detail:Export standard packing with processed wood pallet |
Delivery Detail:Within 15-20 days after receiving advance payment |