china gypsum power production line supplier

gypsum power production line, 1 full automatic, 2 professional installation team, 3. low investment and consumption - details see: https://www.machineto.com/china-gypsum-power-production-line-supplier-10098993
Place of Origin:Hebei China (Mainland)Brand Name:lvjoeModel Number:001After-sales Service Provided:Engineers available to service machinery overseas
color:bluequality:CE certificate and ISO certificatewarranty:one yearinstallment:under the engineers guidance
after sales service:whole lifeConfiguration:high ConfigurationBusiness type:manufactureExperience:10 years rich experience
Control system:PLC control systemTech:Europe  
china gypsum power production line supplier
contact supplier for china gypsum power production line supplier


Hebei Lvjoe Machinery Manufacture Co., LTD has been in this gypsum board production line, gypsum powder production line & magnesium board production line for many years. In terms of cooperation with international customers.

Gypsum powder production line

Annual Capacity: 10,000 t-500,000 t

The gypsum powder production line of which the material is natural gypsum, are equipped with many advanced technological equipment in domestic and foreign such as material averaging device, double-grade crushing system, plate type conveyor, vertical mill, Ramon mill, gypsum boiling kiln, cooling machine and waste heat recycling system, ect. The boiling kiln is widely used in our nation with the advantages of small, simple, great output, small occupied area, easy control, perfect gypsum microstructure, stable physical properties and low running cost. It has been sold to Thailand, Uzbekistan, Columbia and Mexico along with our production line

Quality Standard

The quality of building gypsum is in accordance with Chinese National Standard “Gypsum Powder” (GB9776-2000), and should meet the following requirements:

Grinding Fineness≤0.20mm
Building gypsum calcination temperature~160°C
Packing temperature≤100°C
Qualification rate~95%

the introduction of the art of the calciner

With the development of the gypsum industry, the need of the gypsum powder is increasing in various fields. The leads to our high demands to the gypsum powder. Now, the production craft of the gypsum powder is also improving. During the production and process, the drying and dehydrating precess is the key point, and they are also difficult to master. Due to this phenomenon, after long terms research, we develop a new kind of dehydrated equipment-calciner which can meet all the requirements for gypsum powders production.

Simple structure; it is not easy to demage;

space-saving; intensive-equipment

the low cost of energy;

high quality; the content of the hemihydrate is ideal; the physical property is stable

the allocation of the staff

The Crusher system: 2 person/day(including the forklift driver)

The Mill system: 1 person/8hours(that is 3 people/day)

The Calcined system: 1 person/8hours(that is 3 people/day)

The Heat Supply system: 2 person/8hours(that is 6 people/day)

Electrical engineering: 1 person/day

Machinery maintenance: 1 person/day

Total: 16 person

the calculation of the output

The time of production: 300 days/year* 24hous

The hour output:≥8.5ton/hour(the powder of finished product)

5. (GB9776-88)relative parameter

Finess:≥100mesh

Flexural Strength(having a direct relation to raw material):≥1.8Mpa;

The Strength of Anti-pressure: ≥3.0Mpa

Main Contents: Hemihydrate:≥80%(adjustable);Gypsum:<5%(adjustable)

Soluble Anhydrous: <5%(adjustable)

The initial setting time:3-8min(adjustable);

the final setting time:6-15min(adjustable)

consistency:65%-75%(adjustable)

6. the requirement of the place

(the store-square of the raw material and the finished product warehouse is not included)

25 meters * 15 mete

NATURAL GYPSUM POWDER PICTURES

DESULFURIZATION GYPSUM POWDER MACHINE

Contact with Alina Ma (0086 15028173723)

Skype: alina-myh

china gypsum power production line supplier
Packaging Detail:1) Standards export packing which fit for long time delivery 2) Seaworthy packing.Use 20GP,40GP and 40HQ containers and frame containers.
Delivery Detail:usually 3 months after receiving your down payment

Related Product for china gypsum power production line supplier