China Asphalt Batching Plant
Condition:New | Place of Origin:Henan China (Mainland) | Brand Name:SINOSUN | Model Number:SAP80 |
Voltage:220V/440V ;380V;415V | Power(W):250kw | Dimension(L*W*H):28X30X20 m | Weight:130 ton |
Certification:ISO2001;CE,GOAST | Type:Batch Mix / Hot Mix | Capcity:80 TPH | Cold Feed:4X7.5m |
Drying Drum:1600X6800mm | Burner:1000kg/h | Vibration Screen:16.88 ý#Hot Storage Silos=#28.5m | Mixer:1000kg/batch |
Dust Emissions:.ý0mg/Nm | Noise:.ý0 db(A) |
SAP80 Asphalt Batching Plant
Capacity : 80 TPH
Asphalt Mixer : 1000 kg/batch
Cycle Time: 45 s/batch
Fuel Consumption : 5-7 kg/t (diesel)
Asphalt Temperature (adjustable) : 130°C-170°C
Material Proportion
Filler :5%
Bitumen:3.5-5%
Sand (0-3 mm) : ≤40%
Configuration of Asphalt Mixing Plant
01, Cold Feed System
-- Cold Feed Bins 4 X 7.5 M3
02, Drying and Heating System-
-- drum capacity : 80TPH
-- drum size : 1600 X 6800 mm
-- type: frication driving
03,Burner
-- type : diesel , gas or coal
-- fuel consumption : diesel -5-7 kg/t,gas 5.5~6.5 m³/ t, coal 7~11 kg/ t
04,Dust Collection System :
--- cyclone filter+baghouse filer
-- bag filter type : Nomex (Du Pont USA)
-- filter area: 400m2
-- dust emission :≤50 mg/Nm3
05, Hot Elevator
-- capacity : 100 TPH
-- type: chain +bucket
06, Vibration Screen ( single or double motor)
-- vibrating type: eccentric shaft
-- vibrating screen: 4 layer (7 size)
-- screen area : 16.88m2
07, Hot Mineral Storage
-- storage silo: 28.5m3
--silo number : 4+1 ( 4 for hot mineral , 1 for emergency overflow)
08, Bitumen Supply
--bitumen pump: 300 l/min
--supply type : self-flow
09,Weighting System
-- mineral scale:1000 kg ; ±0.5%
-- filler scale:200 kg; ±0.3%
-- bitumen scale:200 kg; ±0.2%
10, Asphalt Mixing System
-- max capacity : 80 TPH
-- asphalt mixer : 1000 kg/batch
-- driving type : friction driving
11, Mixing Tower :
-- tower ,ladder ,guardrail
--dimension: 15000 X 7000 X 3500 mm
12, Filler Silo :
-- silo volume : 30m3
-- screw conveyor : 219 X 700 mm
13, Bitumen Heating System :
--bitumen tank: 1 X 30T
--heating type :thermo oil heating
14, Compressed Air System :
-- air compressor : 2.0 Nm3
--air tank : 2000 l
15, Auto Control System :
-- control cabin: 4000 X 2200 X 2300 mm
-- PLC control system with multi-language
--PC, Printer, AC, control panel
-- software for the whole asphalt mixing plant
Erection / Commissioning /Training
The seller will send 2-3 engineers to guiding working site, the total erection time 20-30 working time; the buyer should prepare the earthwork and worker teams .
Time Schedule :
Production Time: 30-40 days
Erection Time:20-30 days
Model Available of Asphalt Batch Mix Plant
Model | SAP40 | SAP64 | SAP80 | SAP120 | SAP160 | SAP240 |
Capacity | 40 t/hr | 64 t/hr | 80 t/hr | 80 t/hr | 80 t/hr | 80 t/hr |
Cold Feed System | 4X4m³ | 4X5.5m³ | 4X7.5m³ | 4X8m³ | 5X8.5m³ | 6X11m³ |
Cold Feed Conveyor | B500X16500mm | B600X20000mm | B600X29400mm | B600X29400mm | B650X35750mm | B800X38000mm |
Drying Drum | Φ1200X5200mm | Φ1200X6300mm | Φ1600X6800mm | Φ1800X8000mm | Φ2200X9000mm | Φ2800X9000mm |
Burner | 500kg/hr | 800kg/hr | 1000kg/hr | 1500kg/hr | 2000kg/hr | 3000kg/hr |
Bag-house Dust Filter | 300 | 380 | 400 | 480 | 660 | 720 |
Hot Feed Elevator | 60 t/hr | 80 t/hr | 110 t/hr | 130 t/hr | 160 t/hr | 200 t/hr |
Vibration Screen | 4 layer | 4 layer | 4 layer | 4 layer | 5 layer | 6 layer |
Hot Aggregate Hopper | 10m³ | 10m³ | 30m³ | 30m³ | 40m³ | 40m³ |
Bitumen System | Thermo-Heating | Thermo-Heating | Thermo-Heating | Thermo-Heating | Thermo-Heating | Thermo-Heating |
Filler System | 20 t/hr | 20 t/hr | 30 t/hr | 30 t/hr | 40 t/hr | 40 t/hr |
Mixer | 500kg | 800kg | 1000kg | 1500kg | 2000kg | 3000kg |
Motor Brand | SIMENS | SIMENS | SIMENS | SIMENS | SIMENS | SIMENS |
Control System | SCHNEIDER | SCHNEIDER | SCHNEIDER | SCHNEIDER | SCHNEIDER | SCHNEIDER |
Model | SAP40 | SAP65 | SAP80 | SAP100 | SAP120 | SAP160 | SAP200 | SAP240 |
Capacity | 40TPH | 64TPH | 80TPH | 100TPH | 120TPH | 160TPH | 200TPH | 240TPH |
Mixer | 500 kg | 800 kg | 1000 kg | 1250 kg | 1500 kg | 2000 kg | 2500 kg | 3000 kg |
Packaging Detail:10-12 units 40HQ containers |
Delivery Detail:30-40 working days |