Changhe ZYB 120 Hydraulic sheet injection piling machine Pile Driver
Condition:New | Efficiency:high | Piling Speed(m/min):1m/s | Place of Origin:Hunan China (Mainland) |
Brand Name:Changhe | Model Number:ZYB 120 | Weight:52T | Dimension(L*W*H):9.4x2.6x2.9 |
Certification:ISO9001 | After-sales Service Provided:Engineers available to service machinery overseas | Green:New |
Structure & Function of Hydraulic Static Pile Driver
Hydraulic Static Pile Driver consists of clamping and piling mechanism, lifting mechanism, hoisting mechanism, hydraulic system, electric system, etc, with the functions of hoisting, pressing, walking and steering.
Application Scope
1). No limitation on pile length. suitable to work under various geological conditions, such as collapsible loess, silty clay, sand bed, sedimentation geological stratification and fill stratum and so on.
2). No noise, No pollution during construction, especially suitable for operations in areas with noise control such as schools, social communities, and urban areas.
3). No vibrations. Suitable for vibration-control areas such as subways, overpass, dangerous buildings, precision instrument buildings and those nearby banks.
Patented Technologies of Changhe ZYB series Hydraulic Static Pile Driver
A. the patented pile clamping mechanism and its control system makes pile clamping reliable, keeps pile from being
damaged, and can allow thin-wall-pile be driven easily.1 set of clamping jaw is composed by 4 pieces of blocks, which are separately and directly driven by 4 pieces of oil cylinders in the clamping box. There are auto-swing mechanisms behind the clamping jaws. If clamping jaws don’t hold the pile in the right way, auto-swing mechanisms can adapt the clamping blocks to keep full touch in the surface of pile. As a result, the damage of pile is fully eliminated.
Clamping jaw
B.We design a support pillar under every lifting cylinder. Therefore, lifting cylinders only supply the power of rise and down, avoiding its damage by steering force and lateral force during the movement of machine.
Support pillar
C.Two support pillars are moving on the same guide rail, and connected by a thick stick to prevent damage caused by the lifting pressure reply on one support pillar.
Guide rail
D.Outside-fixed Cantilevers are connected with the machine body by hinge axis. Its rigidity and strength is 30% better than insert cantilevers. After using the machine for a period, you’ll find the gap between the insert joint of insert cantilevers become bigger and bigger.
Cantilever
E.Thepatented tech of multi grade control of pile driving velocity doubles the velocity.
F.The patented auto-reset mechanism (two iron sticks) keeps the guide track of the short boat parallel all the time and protects the damage by unparallel.
Technical Parameters
Max piling pressure(tf) | 120 | Max theory piling speed(m/min) | 14.7 |
Piling stroke(m) | 2 | Grades of piling | 4 |
Longitudinal shift (m) | 2.4 | Rise/down stroke(m) | 1.05 |
Horizontal shift(m) | 0.55 | Max oil pressure of main machine(MPA) | 20 |
Angle range(°) | 14 | Max corner piling pressure(tf) | 40 |
Theory flow of main machine(l/min) | 232 | Max side piling pressure(tf) | 60 |
The centre space of fore and back cantilever axis (m) | 3.96 | The quantity of support leg-diameter of shaft | 4/210 |
Electrical motor power(KW) | 2×22+3.0 | Fit square pile specification | F250-300 |
Fit round pile specification | 300 | Dimension of short boat(m×m) | 2.3×2.5 |
Dimension of long boat(m×m) | 9×0.7 | Ground pressure ratio of short boat | 10.4 |
Ground pressure ratio of long boat | 95 | Total weight of machine body (t) | 54 |
Dimension of transportation (m x m x m) | 9.8(8.8)x2.8x2.8 | Weight of side pile frame (t) | 2 |
Dimension of working condition (m x m) | 9.0(9.0) x 4.9 | Counterweight | 66 |
Packaging Detail:in ocean container |
Delivery Detail:30-40 days after recieving your deposit or LC. |