Cement plant, Cement Equipment,Complete set of cement machinery
Cement Manufacturing Equipment, 1.ISO9001:2008 CE, 2.Lifetime Service, 3.Capacity:300-10000TPD - details see: https://www.machineto.com/cement-plant-cement-equipment-complete-set-of-cement-machinery-10076938
Condition:New | Production Capacity:refer to specification | Place of Origin:Henan China (Mainland) | Brand Name:Hong Xing |
Model Number:pls reference to the form | Voltage:380 | Power(W):refer to specification | Dimension(L*W*H):refer to specification |
Weight:refer to specification | Certification:ISO9001-2008,CE | Warranty:one year | After-sales Service Provided:Engineers available to service machinery overseas |
Energy-Saving::35% | Main equipments::calcinator, rotory kiln, cement mill, ball mill | Main equipments:cement machinery | Supply scope:Cement Plant , Lime Plant , Gypsum Plant, Grinding Slag Plant |
Cement plant, Cement Equipment,Complete set of cement machinery
- company strength
- In cement production line, rotary kiln, ball mill is the indispensable equipment. rotary kiln production and ball mill producted by Henan Hongxing Mining Machinery Co., Ltd. can improve the efficiency of the cement production, saving energy ,let you get more economic interests. Welcome general customers order.
- production capacity:
- Cement production technology and equipment is the advantage of my plants ,my plant the production of cement rotary kiln, cement mill can be used Nissan 3000 tons to 10000 tons of cement plant.
- Complete steps of cement process
- step 1:Raw materials Preparation--Limestone crushing
- a.Process introduction: Limestone is the main raw material in cement production , and most factories are located near the limestone by blasting or use the loader to the mining of raw materials limestone , transported to the crusher into fragments .
- b.The main raw material:limestone,clay,iron ore
- step 2:Raw material grinding --Limestone , clay , iron and other raw materials
- a.Process introduction: the use of ball mill or vertical mill raw material is ground to a powder, and then by conveyor transport to preblending yard for storage and further material mixed
- b..The main raw material:
- step 3:Calcining clinker--raw material powder after homogenization
- a.Process introduction: The homogenized material enters the preheating decomposition system, decomposition rate of 95%, into the rotary kiln, clinker.
- b.List of equipment and processes:Preheater,Decomposition furnace, Rotary kiln,Ball mill, Cooler, Clinker conveyor belt, Belt conveyor ,Dust collecting equipment etc.
- step 4:Cement grinding--Clinker , gypsum,mix materials and so on
- a.Process introduction: Clinker , gypsum, mixed materials in a ball mill , cement grinding into a qualified drug cement. The use of the powder selecting machine can conveniently adjust cement drug, to achieve energy saving production
- b.Main Products:Ball mill, Powder selecting machine ,Bucket elevator, Air chute ,FU chain conveyor, Dust collector etc.
- step5:Cement storage,packaging--Finished cement belt/bulk delivery
- a. Process introduction: The use of packaging machines and automatic loading machine can achieve the shipment of bagged cement factory, use bulk cement equipment can realize bulk cement canning factory
- b.Equipment:Conveying equipment, Dust collecting equipment,Belt conveyor,Elevator Air chute,Spiral screwetc.
Hongxing is able to execute cement plant projects by serving design, supplying, construction, installation as well as commissioning and trial.We produce main machinery for Cement Plant , Lime Plant , Gypsum Plant, Grinding Slag Plant, size from 300tpd to 10000tpd line.
This page is for Cement Plants, Cement Production line, Cement Plants, Cement Machinery, Cement Equipment, Complete Set Of Cement Machinery, Ball Mill. If you are interested in our products, please fell free to contact us.
Technical parameters:
Design capacity(t/d) | 150 | 200 | 250 | 300 | 350 | 400 | 500 | 600 | 750 | 800 | 1000 | |
Product | Active lime calcined dolomite | Active lime calcined dolomite | Active lime calcined dolomite | Active lime calcined dolomite | Active lime calcined dolomite | Active lime calcined dolomite | Active lime calcined dolomite | Active lime calcined dolomite | Active lime calcined dolomite | Active lime calcined dolomite | Active lime calcined dolomite | |
Preheater | Round vertical preheater or polygonal vertical preheater | Round vertical preheater or polygonal vertical preheater | Round vertical preheater or polygonal vertical preheater | Round vertical preheater or polygonal vertical preheater | Round vertical preheater or polygonal vertical preheater | Round vertical preheater or polygonal vertical preheater | Round vertical preheater or polygonal vertical preheater | Round vertical preheater or polygonal vertical preheater | Polygonal vertical preheater | Polygonal vertical preheater | Polygonal vertical preheater | |
Rotary kiln | Specification(m) | D2.5×40 | D2.8×42 | D3×46 | D3.2×50 | D3.5×54 | D3.6×56 | D3.8×58 | D4×60/D4.2×50 | D4.3×58 | D4.3×64 | D4.8×68 |
Effective volume(m³) | 142 | 190 | 235 | 292 | 390 | 430 | 505 | 575/548 | 670 | 738 | 1005 | |
Burning temperature | 1350/1250 | 1350/1250 | 1350/1250 | 1350/1250 | 1350 | 1350 | 1350 | 1350 | 1350 | 1350 | 1350 | |
Cooler | Vertical square cooler | Vertical square cooler | Vertical square cooler | Vertical square cooler | Vertical square cooler | Vertical square cooler | Vertical square cooler | Vertical square cooler | Vertical square cooler | Vertical square cooler | Vertical square cooler | |
Fuel | Coal gas Coal powder | Coal gas Coal powder | Coal gas Coal powder | Coal gas Coal powder | Coal gas Coal powder | Coal gas Coal powder | Coal gas Coal powder | Coal gas Coal powder | Coal gas Coal powder | Coal gas Coal powder | Coal gas Coal powder | |
Heat rate(KJ/KGC3O) | 5300/5000 | 5300/5000 | 5300/5000 | 5300/5000 | 5225 | 5225 | 5100 | 5100 | 4810 | 4810 | 4810 |
Our other mining equipment:
Packaging Detail:standard container,or in bulks, bare main machines, motors and small parts are packed in wooden cases. |
Delivery Detail:20 working days after placing the order |