CE,GOST Approved!!! SC200/200 (2T-4T) Construction Hoist Lift,building construction material lifting equipment
Condition:New | Place of Origin:Henan China (Mainland) | Brand Name:YUEJIE | Model Number:construction lifts for workers |
Usage:Construction Hoist | Power Source:Electric | Sling Type:Wire Rope | Maximum Lifting Weight:4T |
Maximum Lifting Height:150m | Lift Speed:33m/min | Warranty:15 month | After-sales Service Provided:Engineers available to service machinery overseas |
Standard Knot Length:1.508 |
SC200/200 building construction material lifting equipment
I. Brief Introduction to SC Series of building construction material lifting equipment
The SC series of construction elevators are widely used at the sites of industrial and civil construction, bridge construction, underground construction, large chimney construction, ship industry and so on. Being suitable for the vertical transport of materials and people, they can also be used as permanent / semi-permanent electric elevators and in various sites like warehouses and high towers.
II. Main fetures of building construction material lifting equipment
Our construction elevator is specially used for the construction of high rise buildings,residence,towers,chemnys, towers and like so and.
Adopting advanced technology, it can also be equiped with electrical overload warming device, auto landing-call equipment or autimatic leveling device according to your requirement.
1.High precise accessories and durable main parts
2.Good qualified raw materials and strict producting techniques
3.SGS;ISO9001:2000 certificate of quality
4.Adopt international standards approval certificate
a. Cage:single or double
b. Master section:Adopt Welding Robort to weld, reliable in quality and elegant in appearance.
c. Cabin(operating board):provide a comfortable environment for the driver
d. Attanchment frame:the connection device between frame rail and building to ensure the stability of frame rail and all the structure.
e. Safety device: floor-call device, autimatic leveling device, overloading warming device and so on.
All the structure adopt Tooling fixed technology to ensure stable perfomance and stability.
III. Detailed Specification of SC200/200 building construction material lifting equipment
SC200/200 Construction hoist | |||
Specifications | Unit | Parameter | |
Max Load | Kg | 2×2000 | |
Max Passengers | 2×20 | ||
Rated Lifting Speed | m/min | 33 | |
Max Lifting height | m | 150 | |
Max Free End Height | m | ≤9 | |
Modulus of Gear Rack | 8 | ||
Carriage Weight | Kg | 1012×2 | |
Size of Carrige | m | 3×1.5×2.4 | |
Standard Knot Weight | kg | 140 | |
Standard Knot Length | m | 1.508 | |
Cross-section Size of Standard Knot | 0.65×0.65 | ||
Motor | Model | YZE132M-4 | |
Rated Power | KW | 11×3×2 | |
Necessary Electric Power | KVA | 22×3×2 | |
Reducer | Center Distance | mm | 125 |
Transmission Ratio | 1:16 | ||
Overspeed Governor | Type | Progressive | |
Model | SAJ40-1.2A | ||
Operation speed | m/min | 49.5 | |
Brake moment | N.m | 2600 | |
Hoist weight | t | 22 |
IV. Some pictures of building construction material lifting equipment
V.Product Details
A. Productiong process: Strict material selection— blanking— inspection — welding—inspection— Blasting — inspection —Baking finished or galvanized— inspection —Finished product
B. The product can be customized according to customers'requirements (drawing, specifications and so on).
C. Special design for Cage :
1. bottom and roof of Cage adopt trapezoidal frame
2. Bottom and the roof are full symmetry
3. The plane of symmetry are connected by
4. The wall around cage can be fixed by P
5. Surface Treatment: Blasting, Baking finished,Galvanized
construction lifts for workers
Cage is a carrier of construction hoist for carrying personnel and goods,of which , the top serves as the working platform for disassembly and assembly operations.
Cage is s steel structural member with 4 walls composed of knitted wire mesh to facilitate lighting and minimizing wind load. The cage is provided with single and double traveling door as well as safety hook used to prevent disengagement of cage from mast.
construction lifts for workers
building construction material lifting equipment
Mast Section for building construction material lifting equipment
VI. Workshop Details and Transport Details:
1. All Production Line adopt standard of the fixture, mould, gauge
2. Each Construction Lift should be testing-run and adjustment in Factory
3. Workshop 5S mangement style
Packaging Detail:the export standard packaging for building construction material lifting equipment |
Delivery Detail:20 days for SC200 building construction material lifting equipme |