CD-280 30-120pcs auto wet wipe packing machine,wet towel packaging machine
Condition:New | Place of Origin:Fujian China (Mainland) | Brand Name:Chuangda | Model Number:CD-280 |
Voltage:380V 50HZ | Power(W):8KW | Dimension(L*W*H):5280*1000*2100 | Weight:1900kg |
Certification:CE | Warranty:1 year,1 year, Lifelong maintenance | After-sales Service Provided:Engineers available to service machinery overseas | Main material:stainless steel 304 |
motor:servo motor | color:silver | style:full automatic | type:suit for 30~120 pcs/pack |
CD-280 Automatic Equipment Soft Wet Wipe Tissue Making And Packing Machine,baby wet wipes machine,wet tissue facility Equipment
1).Good quality with low price
2).high work efficiency
3).stictly quality control
4).we offer some OEM
5).The Creating value is greater than the value of machine, is worth having.
1.Main Parameter:
Main technical parameter | |
Electrical source | 380V 50HZ |
Power | 8KW |
Production speed | 30~50 packs/min |
Product size | (180~300)×(90~120)×(30~80) mm (L×W×H) |
Control system | PLC control system,Color touching screen |
Suitable material | OPP/PE,PET/PE |
Weight of machine | 1900 kg |
Machine size | 5280×1000×2100 mm (L×W×H) |
Option | Small label1.The length of product will be set in the touching screen, it is easy and convenience. 2.It is avoid to change the mechanical structure site, for set the punching and labeling in touching screen directly. 3.The whole machine is running lower noisy and faster speed with full servo motors. 4.The end products will be printed by Expiry Date and Batch NO. 5.The plastic bag former with degree scale will be adjust to different plastic bag size by simply for Client demand. 6.The tail sealing has the insert cover device. |
2.Pictures of our company:
3.Pictures of machine part
4.Pictures of final products:
Packaging Detail:By exporting standard protective measures. Such packing shall be suitable for long distance ocean and /or air, and inland transportation and well protected against dampness, moisture, shock, rust and rough handling so as to ensure that the goods will safely arrive at the erection or construction site without any damage. |
Delivery Detail:30-35 days |