Casting overhead crane for steel plant
Feature:Bridge Crane,overhead type | Condition:New | Application:mainly used in the factory ,open warehouse ,material stock | Rated Loading Capacity:125/32~320/80T |
Max. Lifting Load:320/80T | Max. Lifting Height:32M | Span:19~28.5M | Place of Origin:Henan China (Mainland) |
Brand Name:KUANGYUAN | Model Number:YZS-16 | Certification:CE ISO TUV GB | Warranty:one year |
After-sales Service Provided:Engineers available to service machinery overseas | brand:kuangyuan | painting color:as requsst | design:as request |
Control Method:Cabin, Pendent or remote controller | Current overload protection system:include | Voltage lower protection function:include | Emergency stop system:include |
Weight overload protection function:include | Buffer:Polyuethane materials |
Casting overhead crane for steel plant
double girder overhead cast crane is one of the main equipments in the continuous casting technology of steelmaking. It is mainly used for pouring melted iron from additive bay of converter to converter; lifting melten steel from refining bay to refining furnace or lifting melten steel from melten steel bay to ladle turret of continuous casting machine.
The overall structure of foundry crane has the following forms: two girder and two rail, four girder and four rail, and four girder and six rail, etc. The form of two girder and two rail, four girder and four rail.
double girder overhead cast crane are mainly used for middle and large-tonnage foundry crane; the form of four-girder and six-rail and two trolley is mainly used for extra large-tonnage foundry crane.
Working condition
Working tempreture:-10~+60°C,
Work class:A7,
Power Source:3ph,380V,50HZ or other under customer requirement.
Safety feature:
Weight overload protection device,
Top quality long time bearing polyurethane materials buffer,
Crane traveling limit switch, Voltage lower protection function,
Emergency stop system,
Current overload protection system and so on!
Design and construction rules:
All the standards which is required for the crane is the Chinese standard of double girder overhead cast crane
painting
Primer and finishing paint
Color: according to your demand.
Average thickness: about 100 microns.
reminders:
1, what's the lifitng capacity?
2,what's the span of the crane(from rail center to rail center)
3,what's the lifting height?
4,what's the working time and frequency?
5,what speeds(lifting speed, travel speed) do you need?
parameter:
Lifting and Travelling Mechanism | ||||||
Capacity/ Lifting Weight | T | 125/32 140/32 160/32 180/50 200/50 225/65 240/80 280/80 | ||||
Span | m | 19~28.5 | ||||
Lifting height | 24 26 | |||||
Cabin control,wireless control | ||||||
Speed | main hook | m/min | 10,7.5 | |||
aux hook | m/min | 12, 10 | ||||
main trolley | m/min | 30,29 | ||||
Lifting mechanism | type | Electric winch trolley | ||||
Working duty | A7 | |||||
Power supply | AC | 3-Phase A.C. 50HZ 380V | ||||
Electric Parts | ||||||
Main electric parts | Siemens brand | |||||
Weight overload protection device | Included | |||||
Crane traveling limited switch | Included | |||||
Voltage lower protection function | Included | |||||
Motor | Heavy duty slide ring type, top quality in China | |||||
Gear and wheel | Manufacture by our own group, so the high quality could be controlled. | |||||
Wire rope | Steel core | |||||
Hook and pulley | Close type | |||||
Buffer | Polyurethane material | |||||
Anti-collision system | Included | |||||
Brake | Electric hydraulic | |||||
Export Markets: | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | |||||
Place of Origin: | Henan in China | |||||
Serial / Model No.: | L Model | |||||
Trademark / Brand: | KY | |||||
Packing: | Packing by woven plastic cloth, electrical parts and other parts packaged in high quality plywood cr | |||||
Unit Price: | ||||||
Minimum Order: | 1 Set/Sets |
Packaging Detail:Electrical and other parts packed by high quality plywood crate,Beams packed by plastic woven cloth. |
Delivery Detail:30~40days after receiving deposit |