Cargo Construction building elevator

1.Two cages and load 2t per cage, 2.Operation speed is 33.5m/min, 3.Standard section is seamless steel tube., 4. Red or yellow - details see: https://www.machineto.com/cargo-construction-building-elevator-10097941
Place of Origin:Chongqing China (Mainland)Brand Name:Hongyan JiDaModel Number:SC200/200Rated Loading Capacity(kg):2000Kg*2
Hoisting Speed:33m/minMax Lifting Height:300Cage's Color:Yellow or RedCage's Size:3.12*2.192*2.57m
Cage's number:2Cage's load:2*2tCage's weight:1800kgStandard section's color:Black or Red
Standard section's size:0.71*0.71*1.508mStandard section's weight:160kgStandard section's number:Based on the lift heightMotor power:2*15kw
Cargo Construction building elevator
contact supplier for Cargo Construction building elevator


The SC200/200 Construction hoist main technical parameter is as follows:

Main Technical Parameter

No.

Items

Parameter

1ModelSC200/200
2Work wayTransmission by gear and rack
3Counter-WeightNo
4Amount of cage (have cab)Double
5Rated load per cage2000kg(19 persons)
6Operation speed33m/min
7Size of Cage External(L×W×H)3.12×2.192×2.57m(have Cab)
8Size of Cage Internal(L×W×H)3×1.3×2.25m(no Cab)
9Size of standard section0.71×0.71×1.508m
10Safety-brake load≥40KN
11Overload protection deviceHave
12Electrical power(Continuous work)15Kw
13Amount of motor2
14engine1440r/m
15Electrical power(continuous work)15kw
16Power supply voltage400v
17Distance between two attachment≤6m
18Weight of cage1600kg
19Weight of standard section170kg
20PackageBare& Band

2.The standard section :

Cargo Construction building elevator
Packaging Detail:Bare& Band
Delivery Detail:The contract enter into force 20 days later delivery

Related Product for Cargo Construction building elevator