Bimetallic Composite Hammer Used in Cement Industry
Cement Industry:, 1.Bimetal material, 2.Strictly control process, 3.National patent product, 4.Durable and stable performance - details see: https://www.machineto.com/bimetallic-composite-hammer-used-in-cement-industry-10076731
Place of Origin:Henan China (Mainland) | Brand Name:Zhili | Model Number:LYZL | Certification:ISO, BV |
Warranty:one year | Material:bimetal material | Hardness:57-62HRC | Certificate:BV certificate ,ISO2008 |
Guarantee:one year against quality defects | Application:cement plant ,quarry ,power plants, mining | physical property:anti-wear | Chemical control:spectrum tester(analyzer) |
Quality tester:ultrasonic fault detector | Heat treatment:anneal,quenching ,tempering |
Cement Industry :
Bimetallic composite hammer is our national pantent product. We successfully combined two different features of high-hardness materials and high-ductile materials into single part to full work.
Detailed Descriptions:
- The material of working part is high chrome,and its hardness is HRC62-65, it has better abrasion resistance, impact resistance, excellent overall performance.
Its assembling end is of alloy steel material of good tenacity to assure the safety of running
- Hardness of bimetal thermal-composite material is up to HRC62-65
Impact ductility is over (AK) 30J/cm2. It has high anti-friction effects and reliable security
- This effectively solves the contradiction between the hardness and ductility to meet and adapt to a variety of complex and harsh working conditions
Practical application shows that the effect of bimetal thermal composite material is 2 to 3 times of high manganese material
- Customized drawings or samples are welcome
Chemical Compositionof working parts:
Chemical Composition (%) | |||||||||
C | Si | Mn | Cr | Mo | Ni | Cu | S | P | |
Cr20 | 2.0-3.8 | ≤1.2 | ≤2.0 | 18.0-23.0 | ≤3.0 | ≤2.5 | ≤1.2 | ≤0.06 | ≤0.06 |
Cr26 | 2.0-3.3 | ≤1.2 | ≤2.03 | 23.0-30.0 | ≤3.0 | ≤2.5 | ≤1.2 | ≤0.06 | ≤0.06 |
Packaging Detail:according to customers' requirement |
Delivery Detail:35 days after payment |