beer equipment, microbrewery equipment, micro brewing
Processing:Fermenting Equipment,mashing and fermentation | Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:KL |
Model Number:KL | Processing Types:Alcohol | Certification:ISO&CE |
2000L Beer Brewing SytemTechnical Parameters | |||
Brewhouse | 2000L | Refrigerator | dedicated for beer equipment, we have two patents for this |
Fermenting tank | 4000L | Temperature measurement | Bi-metal thermometer |
Ice water tank | Glycol | Insulation material | polyurethane |
Material | SS304 or red copper | Malt miller | 200kg/h |
Color | Metal Color | MOQ | 1 set |
Thickness | 2-3mm | Payment terms | T/T |
Controlling way | automatically or PLC | Package | Steel frame and wooden case |
Bottom | cone | Delivery date | 40 days |
Heated way | Electricity or LPG | Service | Free installation, one year warranty |
Jinan Keli Machine Equipment Production Co., Ltd is a very professional beer equipment manufacturer and supplierwithmore than 20 years’ experiencein this field, and our products sell well both at home and abroad.
Our manager is a senior technician with two patents in refrigerating equipments dedicated for beer equipment.
And we are the main supplier of beer refrigerating equipments for most beer equipment factories in Jinan.
As we all know, refrigerating equipment is very important for the cooling of fermention tanks. So, the quality of our equipment is definitely out of doubt.
Advantages:
1.Cylindercone botton shape and dished top head
2.Finishing: Mirror polishing (inner 3mm and outer 1.5mm)
3.Material: stainless steel 304 with low price or red copper with nice-looking
5.Quality: ISO9001:2000 and CE certificate
We guarantee the highest quality and best price . And welocme to inquire and visit to our factory.
For further information, please don't hesitate to contact us!
Packaging Detail:exporting standard, wrapped with black cotton or with plastic film firstly then outside by iron frame or wooden box. or according to customers' requirements. |
Delivery Detail:within 45 days after 50% T/T |