beer brewing fermenter to your requirtments
The beer equipment have the high technology ,welding level and the superior quality, Material:stainless steel, Thickness:1.5-3 - details see: https://www.machineto.com/beer-brewing-fermenter-to-your-requirtments-10032623
Place of Origin:Shandong China (Mainland) | Brand Name:ZD | Model Number:ZD 800L | Processing Types:Beer |
Processing:Washer,Fermenting Equipment | Color:metallic | material:stainless steel | controling method:Manual or automatical |
insulation material:polyurethane | Heated way:electricity or LPG |
What you have seen in the picture is the fermentation tank which is used to store or ferment the beer .You can see the tank is very shine ,because the outer of the tank is polished into mirror surface .The thickness of the outer is 1.5 mm.We used the polyurethane to protect the heat .There is a manhole on the side or the top of the tank .The fermentation tank have a cone bottom whose anglel is usually 60. The leg of the tank can be adjusted .AND we will manufacture the beer equipment according to your requirements.
The whole set beer equipment is as below:
Mash/Lauter tun
Boiling kettle/Whirlpool tank
Hot water tank, used to supply hot water to boiling kettle
Fermentation tank
Ice water tank
Glycol tank, used to cool the system
Bright beer tank
Caustic soda tank
Disinfectant tank
Yeast dosing tank
Refrigerating unit
Heat exchanger
Power control cabinet
Filter machine
Pumps
And other small fittings
1. PRODUCT INFO
Description of goods | BEER BREWING EQUIPMENT |
Capacity | 100L-30,000L |
MOQ | 1 PC,THE MORE THE CHEAPER |
Lead time | 20-60 days,based on the QTY and DESIGN |
Packaging | Steel frame or exporting standard wooden case,up to you. |
Payment | T/T |
Supplying ability | More than 100 pcs per year,based on the capacity |
Port of loading | Qingdao |
Trade term | FOB/EXW |
Material | FOOD GRADE S.S.304 |
2.TECHNICAL SPECIFICATION
Inner surface | S.S.304,WELL POLISHED,polishing precision≤0.4µm,THK:2-4mm |
Outside surface | S.S.304,frosted or mirror,THK:1.5-3mm |
Top shape | Seal head or conical head |
Conical degree | 60-90°c |
Manhole location | Side upward/side/flanged |
Insulation | Material:PU,THK:70-100mm |
Cooling jackets | Spiral cooling jackets at bottom and side wall. |
Spray ball | Located in the center of inside of the tank |
Pressure | 0.2MPa |
Thermometer | Bi-metal thermometer |
Legs | 3/4 round legs,can designed to be adjustable |
The ratio of working volume to gross volume | 4/5 |
Operational method | Automatic or manual |
Technology processing | Argon-arc welding,well weld in double sides. |
We are sincerity to your kind inquiry and visit!
We have the lead time ,reasonable price and the most satisfactory service .
We are looking forward to your inquiry and visit
Please have no hesitation to contact us!
Packaging Detail:ferric bracet or wooden case with membrane film on the outer of the taank |
Delivery Detail:45 days |