Automatic Steel Roof Curving Machine
Place of Origin:Fujian China (Mainland) | Brand Name:Morewinners | Model Number:YX65-760 | After-sales Service Provided:Engineers available to service machinery overseas |
thickness:0.4-0.65mm | raw material:color steel | effective width:760mm | driving type:gear |
material of raw:40Cr; finish machining | Main motor:2.2KW | Curving speed:0-9m/min; adjustable | positive arch radius:min. 5 meters |
The description ofAutomatic Steel Roof CurvingMachineare following:
1.Main technicial data:
thickness | 0.4-0.65mm |
raw material | color steel |
driving type | gear |
material of raw | 40Cr; finish machining |
Main motor | 2.2KW |
Curving speed | 0-9m/min; adjustable |
positive arch radius | min. 5 meters |
2. Quality requirment:
1), All of rollers' surface should be painted with hard chrome.
2), The surface of formed sheet should be flat and straight without scratch.
3), The formed sheet should accord with GB/T 12755-2008.
3.Terms of payment:
1), 30% deposit is required by T/T within ten-business days from the contract signing date.
2), 70% is required by T/T prior to ship equipment from our factory.
4.Test material
1), It is the responsibility of the client to provide us with sufficient testing panel to china for testing at
least 30days prior to ship equipment from our company.
2), All costs relation to the local transport, customs clearance and local taxes for the sample material will be
paid by the customer.
5.Service after sell:
1). In correct operation & maintaining,the machine is guaranteed for one year since leaving our factory
excluding the electric elements.
2). If necessary,MWIN company will dispatch a technician to the factory abroad to install & regulate the
machine with USD 50/day. The buyer should assist MWIN to get the chinese technician's visa and should
pay for the round trip air ticket and the local accommodation.
7.We can also design and manufacture according to customer's requirement.
Packaging Detail:All parts of machine are naked and loaded into the container |
Delivery Detail:within 65 days since the 30% advance payment received |