Automatic Sesame Butter Grinder Machine With Low Power Consumption
Condition:New | Place of Origin:Henan China (Mainland) | Brand Name:Thoyu | Model Number:TY |
Type:Sesame Butter Grinder Machine | Name:Sesame Butter Grinder Machine | Usage:make peanut and sesame butter,toothpaste,fruit jam,soybean milk, etc. | Application:Food,Pharmacy,Chemical Industries |
Material:Stainless Steel | Voltage:can be adjusted to meet your requirements | Productitvity:30-1500kg/h | MOQ:1set |
Package:wooden case | Delivery time:within 7 days after receiving the fist payment | Payment Term:T/T, West Union, Money Gram, Alibaba Escrow |
Sesame Butter Grinder Machine:
1.Introduction of Sesame Butter Grinder Machine:
This machine is a colloid mill which has widely application. We usually used it to mill peanut butter and sesesame butter and many other material. It can mill the raw material into super-imperceptible powder. So it is widely used in food, chemical, pharmacy and other industries.
2.Usage of Sesame Butter Grinder Machine:
We usually used it to make peanut butter, sesame butter, fruit jam, soybean milk, artificial corn milk, cream, compound perfumery, pigment, lubrication oil, dyestuff, pant, fish live oil, toothpaste and many other material.
3.Technical Parameters of Sesame Butter Grinder Machine:
Model | TYP-80 | TYP-130 | TYP-180 | TYP-240 | |
Output size | 2----50 Micro | ||||
Capacity | 30-40kg/h | 200-250kg/h | 400-450kg/h | 1000-1500kg/h | |
Power | 4kw,380v,50hz | 11kw,380v,50hz | 18.5kw,380v,50hz | 37kw,380v,50hz | |
Diameter of rotor | 80mm | 130mm | 180mm | 240mm | |
Dimension mm | 685*335*928 | 975*456*1054 | 981*471*1124 | 1319*500*1276 | |
weight | 210kg | 400kg | 420kg | 1300kg |
We can provide a whole production line for you. You can also choose other food processing machine in our factory.
4. Pictures of Sesame Butter Grinder Machine:
5.If you have any question about our machine, please contact me.
Packaging Detail:wooden case, standard export package of sesame butter Grinder machine. |
Delivery Detail:Within 7 days after receiving the first payment. |