automatic Milking parlor for big farm 2013 hot sale
Condition:New | Type:milking parlor | Use:sucking and colleting fresh milk | Place of Origin:Shandong China (Mainland) |
Brand Name:KLN | Warranty:1 YEAR | After-sales Service Provided:Engineers available to service machinery overseas |
Main Equipments List for Milking Parlor: | |||||
1. Vacuum pump system: 1 set | |||||
2. Vacuum air system: 1 set | |||||
3. Air pipeline and system: 1 set | |||||
4. Milking pipeline and system: 1 set | |||||
5. Measuring system: | |||||
6. Cleaning system: 1 set | |||||
7. Electric control system: 1 set |
Payment Terms:30% by TT In Advance, Balance before Delivery. | |||||
Shipment:By sea | |||||
Country of Origin:P. R. China | |||||
Delivery Time:Goods is in stock, it need 7 days for the inland transportation to Qingdao warehouse. | |||||
Documents Supplied:1)Original Bill of lading; 2) Commercial invoice; 3) Packing list; 4) Other documents. |
Guarantee: 1 year(excludes the quick-wear parts). During the gurantee period, if the main equipments defective as the bad quality without any workers wrong operation, the seller should replace the parts for free or supply the new equipments for free. |
Installation: 1.If the buyer require the installation service from the seller,the seller will send two technical engineers to the buyer's site to guide installation, take trail run and train the workers and finish the installation and training within 10 days. The buyer should bear the cost which is actual expenses for the visa, roundtrip tickets, insurance, accommodation and labor of engineers. The labor charge for each engineer isUSD80perday. 2. Tools for Installation should be provided by the buyer, detailed list of tools should be provided by the supplier. |
Packaging Detail:wooden case and carton box |
Delivery Detail:7 days |