Automatic Leveling Machine 3-2
Condition:New | Type:Straightener & Cutter | Use:Sheet | Place of Origin:Jiangsu China (Mainland) |
Brand Name:HB | Model Number:W43G | Voltage:380V 50Hz | Power(W):According to model |
Dimension(L*W*H):According to model | Weight:According to model | Certification:CE | Warranty:18 months |
After-sales Service Provided:Engineers available to service machinery overseas | Motor:WUXI, China | Pump:HCHC,China | Axletree:ZWZ,China |
Electric components:Schneider, France | Seal in the cylinders:NOK, Japan | Hydraulic valves:Yuken | PLC:DELTA |
Touch Screen:DELTA | USE 1:LEVELING PLATE | USE 2:STRAIGHTNING METAL PLATE |
Automatic Leveling Machine
Components of Automatic Leveling Machine :
The leveling roller and multiple sets of support roller constitute the four-high roller structure of the four-high Automatic Leveling Machine .
- Straightening roller materials including 42CrMo, GCr15, 9CrSi and 9Cr2Mo are available in our company.
- Distribution box of this roller straightening machinery is homemade. The gear adopts 20CrMnTi penetration gear.
- HB four-high automatic leveling machine supplies manual adjustment and electric adjustment optional for customers.
- The handling of straightening roller includes quenched and tempered to stress, quenching (HRC54, HRC60), cold plate, stainless steel plate, and surface plated hard processing of leveling roller.
- This automatic leveling machinery is mainly applicable for leveling carbon steel plates and stainless steel plates.
- We mainly use manual or electric pump centralized lubrication for four-high automatic leveling machine .
- Our company provides ZQ standard, ZY-hardened and TR hardened reducers.
- The universal connecting shaft adopts automobile cardan shaft or metallurgical cardan shaft.
Technical Parameters of Automatic Leveling Machine
Conditions of Sale | ||
1 | Time of delivery | 60 working days after received 30% T/T deposit |
2 | Payment Terms | 30%T/T deposit, 70% T/T before shipment |
3 | Packing | Normal packing in complete machine, accessories packing in wooden crate |
4 | Guarantee | 18 Months from the date of the machine start-up, except for the usable materials and excluded our technical visits |
5 | Saleservice | Freely offer operation manual and quality certification. Freely offer one set of installation and maintenance tools. |
6 | Installation | Cost for installation at worksite according to buyer. |
QUALITY MEASURE
1). Quality assurance system
Company organizes the production as per ISO9001:2008 standard. From design control, process control, inspection control to delivery, installed and service, the whole process control. The running of quality system performs quality manual, procedure files, work instruction and related technical and management standard together with standard and regulation layout by company strictly. Quality system realizes whole screw and whole procedure control completely.
2). Quality assurance procedure for important out-source parts.
a. Mainly out-sourced parts: control system, cylinder, hydraulic components, motor, pump etc.
b. After evaluation, select qualified suppliers as business partners.
c. Purchasing according to plan, purchase contract, quality requirement, technical standard and inspection standard.
d. Receiving inspection on site either in supplier or our company with related technicians.
TECHNICAL SERVICE &. OPERATOR TRAINNING
1). Design examine
When designing and manufacturing the machines, manufacturer should be as per ISO9001 standard strictly to assure the system be performed effectively. According to contract requirement, to supply quality eligible, meet the professional design standard.
2). Operator training
During the installing and commissioning period, supplier arrange time to training buyer’s operator including operation, maintenance etc. supplier should solve the buyer technical questions about operation, maintenance and technics etc. Operator trained by supplier should do his commitment independently.
MACHINE QUALITY
Machine design and manufacture performsoccupation standardand comply with the requirement of quality, specification and characters herein this technical regulation.
Guarantee period start from the day the machine acceptance report signing. Period would be one year.
Technical documents which supplier in charge of furnish and handed to use should be consist with technical regulation, and throughout technical, technics, produce, installation and setting.
INSTALLATION, SETTING &. AFTER-SALE-SERVICE
1). Installation and setting;
Manufacturer is in charge of the machines installation &. commissioning. User is request for in charge of the round tickets &.boarding &. necessary salary of the engineers.
2). After-sale-service;
Manufacturer will in charge of the technical service for the whole using life of the machine.
Packaging Detail:Normal packing in complete machine,accessories packing in wooden crate |
Delivery Detail:According to the model,with large quantity in stock |