automatic gypsum powder production line with high quality and high profitable production line
Condition:New | Application:Construction area | Automatic Grade:Automatic | Place of Origin:Shandong China (Mainland) |
Brand Name:YT | Model Number:YT2010 | Voltage:client industrial voltage | Certification:CE ISO9001 |
Warranty:one year | After-sales Service Provided:Engineers available to service machinery overseas | Working time:contious | Fuel consumption:Lower |
Drying type:Boiling furnace | Raw material:Gypsum rock or phosphogypsum waste |
automatic gypsum powder production line with high quality and high profitable production line
Linyi Yuanteng Machinery Co.,Ltd was established in 1995,located in Economic development zone,Hedong district,Linyi city,has been engaged in designing and manufacturing construction machinery for more than 15 years,accumulating rich experience in equipment design,manufacturing,installation,commissioning and production. Exported to more than 15 countries such as: Laos, Uzbekistan, Russia, Oman, Ethiopia, etc.
Gypsum powder production line brief introduction:
1.Capacity:
20,000 ton/year~300,000 ton/year (Annual production according to 300 days calculate, 24 hours of continuous production)
2.Automation:
high degree automatic
3.Calcination system:
using boiling furnace to calcine, adopting heat conductive oil furnace as heat source
4.Fuel:
coal, natural gas, heavy oil, diesel oil
5.Main materials:
natural gypsum rock, desulfurization gypsum, phosphorizaiton gypsum
6.Standard of product quality:
In conformity with national standard “GB/T 9776-2008 construction gypsum”
7.Advantage:
(1) the equipment structure is reasonable, energy saving ,high degree of automation , producing cost is low , have competitive advantage .
(2)We can offer the services of design, producing, installation, commissioning and training, as well as turnkey project for customers.
8.Our cooperation customer:
For more detail, pls feel free to contact me:
Peter
Mob:0086-18866981172
Skype:ytpeter
Packaging Detail:containers.ship or railway.it will need about 4-20containers,which depends on production capacity |
Delivery Detail:90days |