Automatic coal fired water tube boiler low power steam turbine
Condition:New | Type:Natural Circulation | Usage:Industrial | Structure:Water Tube |
Pressure:Low Pressure | Style:Horizontal | Fuel:Coal-fired | Place of Origin:Shanghai China (Mainland) |
Brand Name:Sinopower | Model Number:SZL/DZL/DHL | Output:Steam | Certification:ASME |
After-sales Service Provided:Engineers available to service machinery overseas | low power steam turbine:low power steam turbine |
low power steam turbine
DZL series of coal fired single drum grate boiler/coal fired water tube boiler
A) Full types of coal boiler/coal fired water tube boiler
1)DZL series single drum fire grate coal boiler/coal fired water tube boiler -----Capacity:0.5-20/h
2)SZL series double drum fire grate coal boiler/coal fired water tube boiler----Capacity:4-35t/h
3)DHL series new large capacity angular tube type hot water coal boiler/coal fired water tube boiler -----Capacity:3--500t/h
4)CFB series circulating fluidized bed boiler/coal fired water tube boiler -----Capacity:10-500t/h
B) DZL series of coal fired single drum fire grate boiler/coal fired water tube boiler
DZL series horizontal boiler is horizontal package water and fire tube boiler, in which there are corrugated gas tubes with function of high-efficiency heat transferring. On both sides of the furnace, there are bare-tube water wall. The tube hole from which the water wall enters the boiler drum is radial hole, and the governing box is installed on the right side of the boiler. The water inlet and outlet tubes of the economizer, the valves and the operation of boiler fire poking are all on the right side. The coaling gear is installed in front of the boiler. The blower, induced fan and dust-removing devices should be installed outdoor.
C) Wellink DZL series of coal fired single drum fire grate coal boiler/coal fired water tube boiler features
1) high efficiency: The boiler can reach the nameplate output, and has overload capacity.
2) the operation of coal feeding and ash exhaust is mechanized, which reduces the labor intensity of the boiler operators.
3) low construction investment. When the boiler is shipped to the field, only after installment of the valve pipes, gas tubes of blower and induced fan, and water and electricity, it can be put into operation.
4)Compact structure, small size, complete transportation, rapid firing up, and so on.
5)Wide combustion coal adaptability, When the rear arch is slightly modified, bituminous coalII and meager coal can also be used 6)Complete transportation, rapid firing up
D) Our factory
Packaging Detail:seaworthy packages |
Delivery Detail:30days after receiving the 30% payment |