Auto Rice milling Machinery
Condition:New | Place of Origin:Jiangxi China (Mainland) | Brand Name:Customer Requirement | Model Number:Customer Requirement |
Production Capacity:Customer Requirement | Voltage:440 | After-sales Service Provided:Engineers available to service machinery overseas |
TECHGEN ENGINEERING LTD.is an Engineering, Indenting, Trading, Importing & Exporting House located in the Dhaka, the capital city of Bangladesh. Techgen Engineering operates business with a group of dynamic, hardworking and committed people who has vast knowledge in connection with food, Beverages, Dairy, Packaging, Power, Waste Water Treatment, Bottling and Canning & other Process Equipment in the Industrial sector.
TECHGEN working with world leading manufacturer who has proven & state of art technology mainly from Europe, America, & Asia. We take the advantage of globalization and crowds of famous & renowned manufacturer's local representative in Bangladesh, providing their modern technology to our Entrepreneur / Industrialist.
We at TECHGEN always see the interest of client and not only consider the machine with superior price/performance ratio and low running cost, but also keep close look to the experience for products innovation and cost reduction. We continue to consistently supply, innovative and creative design the solutions and we are able to provide both strategic and Practical solution to all manner of required application, problems and specification required.
With in-house designers, engineers and project managers, we are confident that we can offer you the service and technical Know-how to produce the perfect solution for your project and service needs comprising of the followings:
- Consultancy
- Design
- Production
- Project Management
- Sales
- After Sales Services
We welcome our customers for any further information and look forward to satisfy their each requirement as per their desire We are always ready to assist & co operate our customers at all times.
Packaging Detail:1. Firstly be wrapped by plastic film. 2. then make stainless steel supporter with Styrofoam on it under the equipments. 3. last the equipments will be put in wood crates. |
Delivery Detail:2 month after L/C |