ATON 4.5/5.0KW Electric start Air-Cooled Gasoline Welders

ATON Air-Cooled Gasoline Welders, 1)Good quality and service, 2)low fuel consumption, 3)CE,EPA,SONCAP, 4)High efficiency - details see: https://www.machineto.com/aton-4-5-5-0kw-electric-start-air-cooled-gasoline-welders-10140392
Place of Origin:Fujian China (Mainland)Brand Name:ATONModel Number:XGWY6500CXLEInput Voltage:110-240V
Welding Pressure:110-240VDimensions:700*530*560Weight:90/93Usage:welding&electricity
Displacement:420Warranty:1 year warrantyRate power when welding kva:2/2.320FT sets:136
Welding Load continuous Ratio:40%Fuel tank L:25Frequency hz:50/60Starting mode:Electric
Bore*stroke mm:90x64Lube oil system:Splash Type  
ATON 4.5/5.0KW Electric start Air-Cooled Gasoline Welders
contact supplier for ATON 4.5/5.0KW Electric start Air-Cooled Gasoline Welders


ATON 4.5/5.0KW Electric start Air-cooled Gasoline Welders

Feature

1. Italian power genenraton, welding technology.

2. Direct-injection engine, long life, low fuel consumption, environment protection,

strong OHV genenrator power generating, welding at the same time.

And improving work effciency.

3. Lightweigt, compact design, durable wheels convenient for transportation.

4. Easy maintenance

Main parameter

Open-type Gasoline generator with welding
ModelXGWY6500CXLE
Frequency hz50/60
Voltage V110-240
Rate power when welding kva2/2.3
Welding voltage at zero load V50-80
Welding DC A190
Welding work voltage V22-28
Welding Load continuous Ratio40%
Welding Current regulation range A50-190
Factor1
Starting modeElectric
Rate Power without welding kva4.5/5
Max.Power without welding kva5/5.5
Gasoline Engine Model190E/15HP
Bore*stroke mm90x64
Engine type4-Stroke,OHV 25° inclined single cylinder , Air-cooled,
Displacement420
Lube L1.1
Fuel tank L25
L*W*H mm700*530*560
N/G.W kg90/93
20FT sets136

F A Q

♥ Q: What is your MOQ of this item?

A: 50 sets

♥ Q: Is it all right to make customer’s own brand name?

A: Sure, we can be your OEM manufacturer with your authorization of brand.

♥ Q: What are your payment terms?

A: T/T 30% deposit,70% balance against the B/L copy or L/C at sight.

♥ Q: How long is your warranty?

A: Guarantee for one year or 1000hours (accord to whichever reach first) from ex-factory date.

♥ Q:What is the delievery time?

A: 25~30 days after receiving your deposit.

Company strength and production line

Products Certification

Other Products

ATON 4.5/5.0KW Electric start Air-Cooled Gasoline Welders
Packaging Detail:Carton
Delivery Detail:25 days after receipt of deposit

Related Product for ATON 4.5/5.0KW Electric start Air-Cooled Gasoline Welders