Anping automatic razor barbed wire machine
Condition:New | Place of Origin:Hebei China (Mainland) | Brand Name:MT | Model Number:APM |
Voltage:380V | Power(W):1.5KW | Dimension(L*W*H):1700*1100*1000mm | Weight:1T |
Certification:ISO9001 | Warranty:One warranty year | After-sales Service Provided:Engineers available to service machinery overseas | material:cast iron |
Machine:for razor barbed wire fence |
Anping razor wire making machine
1.Product line
Razor Barbed Wire Mesh Machine
Main Machine
Overal Diamension | L*W*H:1100MMX1000MMX1700MM |
Rated Voltage | 380V |
Power | 1.5KW |
Producing speed | 220-280m/h |
Weight | 1000KG |
Coiling Machine
Overal Diamension | L*W*H1100mmx750mmx1200mm |
Rated Voltage | 380V |
Power | 1.5kw |
Producing speed | 80kg/h |
Weight | 300kg |
1.Razor Wire Machine with five strips is light-style,easy to operate,high efficiency,can save 20% raw material,it is best choice for clients.
2.It is mainly consists of main machine which can produce the strip plate and coiling machine which can coil the wire into the strip plate.
Overal Diamension | L*W*H: 1200MMX1000MMX1900MM |
Rated Voltage | 380V |
Power | 2.2KW |
Producing speed | 220-280m/h |
Weight | 1500KG |
Coiling Machine
Overal Diamension | L*W*H:1100mmx750mmx1200mm |
Rated Voltage | 380V |
Power | 1.5kw |
Producing speed | 80kg/h |
Weight | 300kg |
2.Process of Punching machine for razor barbed wir fence
Wire warp machine Rated voltage:380v Producing speed: 80kg/h | ||
Accessory Equipment Wire rock strip rack Coiling rack | ||
3. Packing |
4. Sales Service
Maintenance period:one year
We can send our technical staff to the buyers' place to debug the machine and providing in 30 days after the machines arrive at the destination port.
The debugging fees:free
The training fees:frist 7 days is free ,after that USD 100/day for each technical
The numbers of technical persons:one technical person per machines at most.
The fees,such as round-trip tickets,accommodation etc,are all in buyers" account.
During the maintenance period:teh parts damaged non-artificially will be provided free of charge.If buyers need the technicians,we will assign the technical staff to your company.And the fees,such as round-trip tickets,accommodation etc,are all in buyers account.
After the maintenance period:If buyers need the machine parts,we will provide it as our cost.If buyers need the technicians,we will assign the technical staff to your company .And the fees ,such as round-trip tickets,accommoddation etc,are all in buyers'account
Packaging Detail:as your requirement |
Delivery Detail:45 days after prepayment |