Aluminum Alloy Rod Breakdown Mill, Wire Drawing Mill
Place of Origin:Sichuan China (Mainland) | Brand Name:141 | Model Number:LHD-450/13(11) | Usage:drawing |
1.Product Information
LHD-450/13 Aluminum & Alloy Wire Drawing Machine | LHD-450/11 Aluminum Wire Drawing Machine | ||
Main Machine | Inlet Wire dia. | Alloy Φ9.5mm Al Φ9.5mm(Φ12mm) | Φ9.5mm(Φ12mm) |
Out Wire dia. | Alloy Φ2.1~4.5mm Al Φ1.90~4.8mm | Φ4.8~2.10mm | |
Max. Linear speed | Alloy 20m/s, Al 25m/s | 22m/s | |
Max. Drawing Pass | 13 | 11 | |
Finish Capstan Dia. | Φ450mm | Φ450mm | |
Speed ratio between capstans | 1.238 (1.241) | 1.3~1.10 | |
Max. Dies' size | Φ54×38mm | Φ54×38mm | |
Main motor | 315kW(DC) | 200kW(DC) | |
Finish capstan motor | 75kW(DC) | 55kW(DC) | |
Accumulator | Accumulating wire length | 5.0m | 5.0m |
Accumulated wire tension | 400N | 400N | |
Dual take-up | Max. take-up speed | 25m/s | 25m/s |
Max. traversing pitch | 6mm/r | 6mm/r | |
Take-up motor power | 22×2kW(DC) | 22×2kW(DC) | |
Take-up bobbins | PND500-630(DIN46397) | PND500-630(DIN46397) | |
Others | Total weight | 40t | 36.2t |
Overall dimension | 23.22×4.4×5m | 23.22×4.4×5m |
2.Design / Structure / Details Pics
1) Features
§In horizontal and tandem construction,modular combination simplifying the equipment on assembly and installation.
§Driven by double motors to realize fast die-change.
§A helical gear transmission of high efficiency with low noise.
§A fully immerging emulsion system to ensure an effective cooling and lubricating for wire and dies.
§ The aluminum rod breakdown machine, wire drawing machine is with an unique guiding wire mechanism to ensure the drawing quality of wires.
§Automatic dual take-up to realize a high degree of automation and a high efficiency.
2) Application
§The aluminum alloy rod breakdown machine, wire drawing machine is mainly used to draw aluminum alloy wires from rod.
§ The aluminum alloy rod breakdown line is composed of pay off stand, main drawing machine, wire accumulator, dual take-up, wire pointer and stripper, electric control system,etc.
3. Factory View or Certificates
Packaging Detail:Most of the parts are naked in container, while some parts are put in container with plywood box. |
Delivery Detail:Within 60 days after receiving the 30% deposit |